Laserfiche WebLink
All "t <br /> 01717i`n C UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD ) <br /> 1 . Site map enclosed? YES [ I NON <br /> 2 . Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component, describe how this will be done. ( If <br /> adding piping , UDC' s , or other UST equipment, or performing tank top upgrade , use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review) : <br /> Remove existing Diesel 3 gallon overspill container. Install new 5-gallon overspill container <br /> including drop tube , fill adapter, and cap. <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval ): <br /> 1 ) OPW 1 C -2100C - DEVR - 5 Gallon overspill container <br /> 1 ) OPW 71 S041 OC Drop Tube <br /> 1 ) OPW 61SALP- 1020EVR Fill Adapter <br /> 1 ) OPW 634TT-7085EVR Fill Cap <br /> 1 ) OPW FSA400S Face Seal Adapter <br /> 1 ) OPW JSK44CB Jack Screw <br /> j <br /> j <br /> 3 <br /> I <br />