Laserfiche WebLink
Page 3 <br /> May 1, 2001 <br /> Mr -timothy J. Cuellar <br /> Advanced GeoEnvironmental Inc. <br /> Ante-siphon control system ( at the last adsorber vessel) <br /> interconnecting process pOng, from 500 gallon holding tznk through <br /> system, 2" pvc schedule 40, straight end pipe. <br /> Sample ports at the iniet, and in between the adsorbers, and at the <br /> outlet of the system (5 total) <br /> Secondary containment system, approximate dimensions 20 feet x 17 <br /> feet x 2.,5 feet, heavy duty polyethylene plastic liner <br /> Delivery of the systam, and assembly of the system on site In <br /> Manteca, CA <br /> Ground water pump, 1/2 HP, 230 volt single phase, with electncal <br /> controller and ad3ustable/automatic on/off sensor (dependent on <br /> around water level), and high +evel above ground storage tank shut <br /> down snterlink <br /> The pride to you for all the above ria-cereals including aeiivery and see. <br /> up as described above, is ( plus sales tax if applicable) <br /> We have not incluacd plumbing the water line or r'unninq the eiectrical <br /> from the ground water pump to the tr=atment system <br /> Delivery is 4 weeks upon receipt of order Terms of payment are 3011% <br /> deposit with purciiase order, 35% due upon delivery and the balance <br /> Df 359% due net 30 days <br /> Thank you for this opporturicty we IocK forward to accomplishing this <br /> project witri you <br /> �- Michae E 5 aby <br /> Principal <br /> SUM-AG Inc <br /> [SES/nr <br /> a cv- <br /> � o � <br />