Laserfiche WebLink
r , <br /> Quarterly Report - Third Quarter 2004 <br /> RAINWATER CAR WASH <br /> ' 420 West Yosemite Avenue, Manteca, California <br /> ' 1.0. INTRODUCTION AND SCOPE OF WORK <br /> At the request of Mr Phil Elder, Advanced GeoEnviroiimental, Inc (AGE) has prepared this <br /> quarterly report for 420 West Yosemite Avenue (the site), Manteca, California The report <br /> documents procedures and results for groundwater monitoring and interim groundwater remediation <br /> performed at the site between June 2004 and October 2004 (third quarter) The site setting is <br /> illustrated on Figure 1, site structures and monitoring well locations are depicted on Figure 2 <br /> The enclosed,report was prepared in accordance with guidelines established by the California <br /> Regional Water Quality Control Board (RWQCB) for investigation of underground storage tank <br /> (UST) sites Background information and a description of prior investigations at the site were <br /> ' included in Appendix A of Quarterly Report - Third Quarter 2002, dated 06 December 2002 <br /> The objectives of the third quarter 2004 investigation was to characterize, assess and monitor <br /> dissolved petroleum hydrocarbons and methyl tert-butyl ether (MTBE) concentrations in ground <br /> water,to charactenze ground water flow direction and gradient and to continue interim remediation <br /> through ground water extraction and treatment at the site The following is a brief summary of third <br /> quarter monitoring and interim ground water remediation activities performed at the site <br /> 23 June to 15 September 2004-Continued pump-and-treat interim remediation utilizing on- <br /> site extraction well EW-1,discharged approximately 93,812 gallons of treated ground water <br /> into City of Manteca sanitary sewer system <br /> - 15 July,23 August and 15 September 2004-Monthly monitoring events at the ground water <br /> t extraction and treatment remediation system, extraction well EW-1 was in operation <br /> 04-05 October 2004 - AGE performed a quarterly ground water monitoring event (third <br /> quarter 2004) at wells MW-1 through MW-13 <br /> ' 2.0 GROUND WATER EXTRACTION-TREATMENT REMEDIATION SYSTEM <br /> ' Between 23 June 2004 and 15 September 2004(third quarter 2004), a ground water extraction and <br /> treatment system was in operation at the site as ground water interim remediation The ground water <br /> treatment operation and maintenance procedures for the site were outlined in AGE's Interim <br /> Remediation Work Plan -June 2001, dated 21 June 2001 <br /> Advanced GeoEnvironmental,Inc <br /> 1 , <br />