Laserfiche WebLink
, 1 <br /> , I <br /> n <br /> i <br /> i <br /> 26 April 2004 <br /> AGE-NC Project No 97-0333 <br /> I Page 10 of 12, <br /> i <br /> N , <br /> No other constituents of concern were detected above laboratory reporting limits in the water r <br /> ' samples collected during the fourth quarter 2003 sampling event Analytical results of ground water i <br /> monitoring well samples are summarized in Tables 3 and 4 The laboratory reports (Cal Tech <br /> 1 Environmental Laboratories Identification No 0311-125)and chain-of-custody forms are presented <br /> in Appendix G <br /> 5.0. SUMMARY AND CONCLUSIONS <br /> 4 <br /> Previous soil characteristics data obtained by a CPT investigation enabled AGE,to define four <br /> Informal hydrologic units(CPT Sate Investigation-Fourth Quarter 2000, dated 07 February 200 1) <br /> The Informal hydrogeologic units were defined as First Zone(15-47 feet bsg), Second Zone(58-92 <br /> feet bsg, Third Zone (102-120 feet bsg) and Primary Aquifer Zone (128-150 feet bsg) <br /> I � <br /> The results of pump and treat ground water remediation between 10 September 2003` and 26 <br /> December 2003 are as follows <br /> • <br /> Groundwater pump-and-treat operations were temporarily suspended between 18 September <br /> 2003 and 20 October 2003 due to detection of TBA at the pump-and treat effluent Ground <br /> water pump-and-treat operations were restarted on 20 October 2003 following a change-out <br /> of carbon media from the 3"d and 4th in-line media vessels <br /> „ <br /> Approximately 205,130igallons of hydrocarbon-impacted ground waterwere extracted from <br /> � f <br /> well EW-1,which was completed in the First Zone aquifer A total volume of approximately <br /> 1,871,628 gallons of hydrocarbon-impacted ground water has been treated at the site since <br /> ' { the start-up period in January 2002 (Table 5) <br /> • Dissolved MTBE was detected from grab samples collected at the influent end of the <br /> treatment system,at concentrations between 2,700Fgg/1 and 3,800 pg/l, laboratory analysis <br /> of grab water samples collected at the effluent-end of the pump and treat system detected <br /> TBA during the September monthly monitoring event(Table 1) <br /> r • ' Between 10 September'2003 and 26 December 2003, an estimated 5 18 pounds of MTBE <br /> was extracted from ground water (Table 5, Appendix B), a total mass of 220 34 pounds of <br /> iMTBE has been'removed since Initiation of thepump and treat system on 21 January 2002 <br /> A plot of cumulative ground water pump and treat mass removal versus time and a plot of, <br /> influent ground water MTBE�concentrations,versus time are included in Appendix C, <br /> i although a slight increase was reported in December 2003, the overall general trend of } { <br /> decreasing MTBE concentrations is evident 'I <br /> lieh <br /> I I I I i Advanced GeoEnvironmental,Inc l <br />