My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2516
>
2900 - Site Mitigation Program
>
PR0540433
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 6:45:37 PM
Creation date
7/27/2020 4:09:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540433
PE
2953
FACILITY_ID
FA0023104
FACILITY_NAME
FORMER MANTECA POLICE FIRING RANGE
STREET_NUMBER
2516
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
24131044
CURRENT_STATUS
01
SITE_LOCATION
2516 W YOSEMITE AVE
P_LOCATION
04
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Michael Kith [EH] <br /> From: Rick Day <day@geoconinc.com> <br /> Sent: Wednesday, March 01, 2017 2:52 PM <br /> To: Michael Kith [EH] <br /> Cc: 'Nabaz Saieed (nabaz.saieed@tylin.com)'; Steve Walters (Stephen.Walters@nv5.com); <br /> Johanna Ferriera Qferriera@ci.manteca.ca.us); FEZ (proj.320156@tylin.com); Luann <br /> Beadle; Linda Turkatte [EH] <br /> Subject: Manteca Firing Range Schedule <br /> Hi, Mike. <br /> Nice speaking with you this afternoon and thanks for the call. <br /> Per your request, I am sending you the schedule as currently anticipated. <br /> The contractor(ICS) will likely start excavation next Monday, March 6—their working hours will be 7AM to 313M. <br /> They will start with excavating the CA-haz material along the outside of the excavation boundary. <br /> After they have dug for a few days,we (Geocon)can begin to start collecting some confirmation samples to verify the <br /> outer excavation limits—I anticipate that the first confirmation sampling will be on Wednesday or Thursday, depending <br /> on their excavation progress. <br /> Per our conversation today, I understand that SJCEHD wants to be onsite during the confirmation sampling and we will <br /> be sure to let you know in advance of when we will be collecting samples. <br /> I'll keep you posted on schedule updates if things change. <br /> Please let us know if you have any questions and welcome to the project. <br /> Thanks, <br /> Rick. <br /> Richard Day, CEG, CHG I Principal / Senior Geologist <br /> lowGEOCON CONSULTANTS, INC. <br /> 6671 Brisa Street, Livermore, California 94550 <br /> P1925.371.5900 ext. 401 M1925.872.5860 <br /> day@geoconinc.com / www.geoconinc.com / Facebook / Linkedin <br /> Bay Area - Sacramento - Fairfield - Los Angeles - Orange County - Riverside County - Palm Desert - San Diego <br /> Geotechnical Engineering Environmental Services Engineering Geology Construction Inspection <br /> Land Development Transportation Infrastructure Institutional Brownfields/Redevelopment Natural Resources <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.