My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2516
>
2900 - Site Mitigation Program
>
PR0540433
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 6:45:37 PM
Creation date
7/27/2020 4:09:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540433
PE
2953
FACILITY_ID
FA0023104
FACILITY_NAME
FORMER MANTECA POLICE FIRING RANGE
STREET_NUMBER
2516
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
24131044
CURRENT_STATUS
01
SITE_LOCATION
2516 W YOSEMITE AVE
P_LOCATION
04
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hi Michael. <br /> Additional field work at Manteca firing range is off for tomorrow.The additional costs need to be approved by city <br /> council, which won't happen until May. <br /> We will be back in touch when it gets rescheduled. <br /> Sent from my mobile phone <br /> On Apr 11, 2017, at 11:37 AM, Michael Kith [EH] <mkith 0Dsicehd.com>wrote: <br /> Hi Rick, <br /> I have meeting in the morning. I'll ask Lor if he can go. <br /> Michael <br /> From: Rick Day [mailto:day@cieoconinc.com] <br /> Sent: Monday, April 10, 2017 3:41 PM <br /> To: Michael Kith [EH] <br /> Cc: Johanna Ferriera (iferriermalci.manteca.ca.us); Steve Walters (Stephen.WaltersCalnv5.com); Andy <br /> Mantell (andrew.mantell(&nvS.com); Jennifer Williams (Jennifer.Willlams@nv5.com); Greg Dickinson <br /> (grdickinson(cbpacificedge-eng.com); Logan Linderman; Lor Xiong [EH]; Linda Turkatte [EH] <br /> Subject: RE: Manteca Firing Range Results and Additional Excavation Areas <br /> Hi, Michael. <br /> As a follow-up to our telephone conversation last week,we are still tentatively scheduled to perform the <br /> additional excavation and sampling this week. <br /> The current plan is to mobilize equipment to the site on Wednesday morning and start excavating the <br /> five areas with total lead >80 mg/kg—should have everything excavated and stockpiled by end of <br /> Wednesday. <br /> ICS is planning to load trucks first thing on Thursday morning(1 load RCRA and 5 loads non-RCRA) and <br /> then Geocon will perform the additional confirmation sampling. <br /> Please let us know if you have questions. <br /> Thanks, <br /> Rick. <br /> Richard Day, CEG, CHG I Principal / Senior Geologist <br /> GEOCON CONSULTANTS, INC. <br /> 6671 Brisa Street, Livermore, California 94550 <br /> T P1925.371.5900 ext. 401 M1925.872.5860 <br /> dayOaeoconinc.com / www.geoconinc.com / Facebook / Linkedin <br /> Bay Area - Sacramento - Fairfield - Los Angeles - Orange County - Riverside County - Palm <br /> Desert - San Diego <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.