My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
420
>
2900 - Site Mitigation Program
>
PR0542323
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 7:06:40 PM
Creation date
7/27/2020 4:16:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542323
PE
2960
FACILITY_ID
FA0023548
FACILITY_NAME
SAVE ON GAS (FORMER RAINWATER CAR WASH)
STREET_NUMBER
420
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
21931206
CURRENT_STATUS
01
SITE_LOCATION
420 W YOSEMITE AVE
P_LOCATION
04
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Assessment Work Plan Addendum— August 2017 <br /> SAVE-ON GAS (Former Rainwater Car Wash) <br /> 420 West Yosemite Avenue, Manteca, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION...................................................................................................1 <br /> 2.0. SCOPE OF WORK................................................................................................1 <br /> 2.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES ........................................2 <br /> 2.2. DRILLING...........................................................................................................2 <br /> 2.3. SOIL AND GRAB GROUNDWATER SAMPLING..............................................3 <br /> 2.4. MONITORING WELL INSTALLATION, DEVELOPMENT, AND SURVEY.........4 <br /> 2.5. GROUNDWATER SAMPLING AND ANALYSIS................................................4 <br /> 2.6. PREPARATION OF REPORT OF FINDINGS....................................................5 <br /> 3.0. FIELD PROCEDURES..........................................................................................5 <br /> 3.1. BORING ADVANCEMENT AND SOIL SAMPLING ...........................................5 <br /> 3.2 GRAB GROUNDWATER SAMPLING................................................................5 <br /> 3.3. WELL COMPLETION AND ELEVATION SURVEY ...........................................6 <br /> 3.4. WELL DEVELOPMENT .....................................................................................7 <br /> 3.5. GROUNDWATER SAMPLING PROCEDURES................................................. 7 <br /> 3.6. EQUIPMENT DECONTAMINATIONANASTE MANAGEMENT..........................7 <br /> FIGURES <br /> Figure 1 - Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Off-site Plan <br /> Figure 4 - Approximate Extent of Dissolved MTBE: Zone A <br /> Figure 5 - Approximate Extent of Dissolved MTBE: Zone B <br /> Figure 6 - Approximate Extent of Dissolved MTBE: Zone C <br /> Figure 7 - Approximate Extent of Dissolved MTBE: Zone D <br /> Figure 8 - Well Construction Details <br /> TABLES <br /> Table 1 - Summary of Monitoring Well Details <br /> Table 2 - Analytical Results of Grab Groundwater Samples <br /> Table 3 - Historical Groundwater Monitoring Results <br /> APPENDICES <br /> Appendix A -RWQCB Directive Letter <br /> Appendix B -Monitoring and Sampling Procedures <br />
The URL can be used to link to this page
Your browser does not support the video tag.