Laserfiche WebLink
No monitoring or investigative work has been comp eted at the site. The full delineation and <br /> extent of the contamination or the impact on groundwater has not been completed. There is a <br /> domestic well for the property located at the nortl iem end of the maintenance shop. The <br /> domestic well is approximately 250 feet to the north/ ortheast of the previous UST's location. <br /> 2.0 INTRODU TION <br /> SOIL BORING WORKPLAN /TEMPO RY MONITORING WELLS <br /> In a team effort Del Tech Geotechnical Support (Del-Tech) and Geological Technics Inc. has <br /> been retained by Ted Peters Trucking to prepare and implement this workplan. This workplan is <br /> designed in scope to investigate the site, evaluate d identify the extent of the subsurface <br /> contamination generated by the gasoline underground storage tank previously located at the site. <br /> Don Light, Engineering Contractor #657366 of De -Tech will be Project Manager and Ray <br /> Kablanow, PhD. R.G. #5234 of Geological Tech fics. will be the supervising Registered <br /> Geologist during all of the activities of this modified workplan. The original "Scope of Work" <br /> was presented on June 29th, 1998 for a limited assess ent, however the local regulatory agency <br /> SJPHD has requested a more in-depth assessment tha i what was originally proposed. This new <br /> modified workplan addresses all of the additional tasks requested by this agency. <br /> 2.1 Proposed Investigative Actions <br /> This workplan is being presented as a continued step towards the goal of achieving a County- <br /> approved site closure at Ted Peters Trucking (Man eca facility). Specifically, this workplan <br /> addresses the installation of(5) soil borings to approximately 10 to 15 vertical feet and collecting <br /> (5) grab water samples through a hydropunch devic from the bottom of each of the borings. <br /> (See the attached site sampling map) The primary go is to determine the impact and extent of <br /> the vadose zone and first water interface. Additional y, the center soil boring (in the middle of <br /> the previous gasoline UST location), will be advance down through the upper primary vadose <br /> and saturated zone until a naturally occurring geologi formation is encountered that will act as a <br /> barrier between the primary and secondary aquifers, as determined by the on site supervising <br /> geologist. A soil sample will be collected from the k,wer naturally occurring soil formation and <br /> then a hydropunch water sample collected five feet eyond that point of the secondary barrier. <br /> This task will be completed with the goal of determining the extent, if any, of the vertical <br /> migration of the contamination plume. Contingent Ypon completing this preliminary soils and <br /> groundwater assessment, the full extent of any possibID groundwater contamination plume would <br /> be addressed in a future workplan, if so required. <br /> TED PETERS TRUCKING 1 MAI FIECA WORKPLAN <br /> 2 <br />