Laserfiche WebLink
4.0 SIGNATURES AND C11KRTIFICATIONS <br /> This workplan was prepared by Del-Tech Geological Support and Geological Technics. <br /> The work proposed herein will be performed in accordance with accepted geologic and <br /> hydrologic standards of the State of California acceptel and in effect at the time of this project. <br /> This proposed workplan was prepared by Donald E. L ght. <br /> i <br /> 1 <br /> Don E. Lig63t <br /> California Engineering Contractor#6573661 Hazarde us Waste Endorsed <br /> This proposed workplan was supervised and reviewed by Ray Kablanow, PhD, R. G. <br /> Q�ot.Ess�on,�� <br /> . 4 <br /> h R.I.KABII �W si r� <br /> C7 � <br /> d ND.523A <br /> Ray Kablanow PhD, R. G. #5234 . 3 <br /> stgrFoF CAL*o��,.� <br /> TED PETERS TRUCKING/M CA WORKPLAN <br /> 7 <br />