3,0 PROPOSED IMPLEMENTATION SCHEDULE <br /> Upon review and approval of this proposed workplaii, the investigation would be scheduled to <br /> begin immediately. Variables as to the availability of the drilling support and support personnel, <br /> dictate the actual startup date. A soil boring permit and the necessary (if any) temporary well <br /> permit would also have to be acquired The field event for completing the soil borings and <br /> sampling the temporary wells would be completed in ane day. The subsequent report would be <br /> submitted in 45 days of receipt of the laboratory analytical reports. <br /> i <br /> TED PETERS TRUCKING 1 CA WORKPLAN <br /> 6 <br />