Laserfiche WebLink
Geological Technics I" Page 4 <br /> Groundwater Monitoring Report <br /> Project No 640 2 <br /> May 8,2002 <br />' <br /> requested that three additional quarterly groundwater monitoring events be performed in <br /> order to provide at least one complete annual groundwater monitoring cycle before closure <br />' can be considered This report documents the completion of the second of these three <br /> events <br /> 4.0 SIGNATURES & CERTIFICATION <br />' Geological Technics Inc performed this project in accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation <br /> This report was prepared by <br /> 1 <br /> Joseph IV Aingulo <br /> Geologist <br /> ' Ess40,� Fo <br /> c <br /> H Qi Kia rp <br /> NO 5234 ~ <br /> Raynold I Kablanow II, Ph D * 8-3(• a <br /> California Registered Geologist #5234 ��T-OF <br /> Certified Hydrogeologist #442 <br /> 1 <br /> 1 <br />