Laserfiche WebLink
IGeolagtcaC?ecFraus 2nc Page 3 <br /> soil& Groundwater Investigation Report <br /> Ted Peters-UST <br /> Project 1 2 <br /> Novemberer 3,, I999 <br /> IA chain of custody document, listing all samples collected, accompanied the samples from <br /> field to laboratory, thereby providing a means to track their movement and insure their <br />' integrity <br /> 2.1.3 Laboratory Analyses <br />' Soil <br /> Based on field screening observations, two to three soil samples from each borehole were <br /> submitted to BSK Laboratories of Fresno (State Certified Laboratory #1180) for analysis of <br /> • benzene, toluene, ethylbenzene and xylene (BTEX by EPA method 8020), <br />' • the fuel oxygenate suite (MTBE, DIPE, ETBE, TAME & TBA by EPA method 8260) <br /> • gasoline range petroleum hydrocarbons (TPH-G by EPA method 8015(m)) <br /> • TTLC-Lead <br />' The detection limits for these compounds are listed below A Chain of Custody was <br /> completed for all samples collected and tracked to ensure sample integrity <br /> Detection Limits ersof - - ea <br /> µg g , <br />' Groundwater <br /> The two hydropunch water samples were submitted to BSK Laboratories of Fresno (State <br /> Certified Laboratory #1180) for analysis of <br /> • benzene, toluene, ethylbenzene and xylene (BTEX by EPA method 8020), <br /> • the fuel oxygenate suite (MTBE, DIPE, ETBE, TAME & TBA by EPA method 8260) <br /> • gasoline range petroleum hydrocarbons (TPH-G by EPA method 8015(m)) <br /> • Total Lead <br />' The detection limits for these compounds are listed below A Chain of Custody was <br /> completed for all samples collected and tracked to ensure sample integrity <br />' etection Limits —Ethers Lead <br /> Water µg <br />' 2.2 Monitoring Well Installation <br /> To investigate the lateral definition of gasoline range petroleum hydrocarbons in the <br />' groundwater at this site, Geological Technics Inc installed three water table groundwater <br /> monitoring wells One in the center, one to the north and one to the east of the former UST <br /> (Figure 2, Site Map) <br />' The monitoring wells were constructed using 2 0-inch diameter PVC casing with flush <br /> threads The screened intervals extended from five feet above the water table to ten feet <br /> below the water table Groundwater was encountered at approximately 9 to 10 feet bgs A <br /> ' #12 sand filter pack surrounded and extended one foot above the 0 010 inch screened interval <br /> and was topped by a two foot bentonite chip transition seal installed on top of the filter pack <br /> and hydrated A surface seal was achieved by pumping a neat cement grout (augmented with <br /> <4% bentonite) on top of the transition seal The wells were secured with locking watertight <br /> caps encased in flush mounted traffic rated well boxes <br /> 1 <br />