Laserfiche WebLink
mum <br /> FW <br /> rk Plan far Re-excavation May 3, 1989 <br /> rmer Texaco Service Station, Manteca, California AGS 38053-1 <br /> the SJLHD are reached, the soil will be used as topsoil <br /> on the adjacent property also owned by Mr. Brophy. <br /> o Prepare a report summarizing our findings, conclusions, <br /> and recommendations. <br /> Site Safety Plan <br /> Work at the site will be performed under the provisions of a Site <br /> Safety Plan. This plan will describe the basic safety <br /> requirements for the subsurface environmental investigation <br /> related to removing soil by excavation and soil sampling. <br /> Applied GeoSystems will contact Underground Services Alert to <br /> locate public utility lines at the site before excavating. The <br /> location of the proposed excavation is shown on Plate P-2. <br /> '°IRainaval" of •Product=Deliver Lines and Soil-Sam lin <br /> A Class A licensed contractor will remove the underground <br /> product-delivery lines. Applied GeoSystems will notify the <br /> appropriate authorities and have a representative present onsite <br /> to observe removal of the underground product-deliv-ry lines. <br /> Soil will be removed from above and alongside the product- <br /> delivery lines with an excavator and the lines will be removed. <br /> one soil sample will then be collected from native soil <br /> approximately every 20 linear feet beneath the locations of the <br /> removed underground product--delivery lines. The proposed soil . <br /> 9 <br />