Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> XVI , MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas- <br /> Monitoring System Certification <br /> 1 UST Monitoring Site Plan <br /> _ I <br /> --I -- - - <br /> Sit <br /> eAddress- I Charter Way Chevron 505 W Charter Way Stooktoa, CA IIISM I <br /> 4 IKEY . . . - . . . - - . . - _ - I _ _ - - - =PIPL\G <br /> 3 = 1INN IJL AR } <br /> F = FILLS TLS (ARROWS) <br /> T = TL`RBILiE Drattinw ofptping <br /> - P = PROBE Store exit cf sump and <br /> U <br /> VAPOR ervi <br /> t = SU]IIt SENSOR undderground <br /> drauitre is <br /> L = LeakDetector accurate, hire <br /> A1 = \L+nn �v <br /> B = Brine Sensor cannot speculate <br /> I = Smart Sensor blue prints.5 = <br /> C = Floats & Chains <br /> E = EStop . . - . _ - . . . <br /> i - C 87 <br /> - —� <br /> 1 91 <br /> _ <br /> 87 <br /> IF <br /> - - Charter Way <br /> — -itis• irene nts$s o .aor1 thrs my not %isible ro the cets(fiing rn lmician me a — <br /> IFa-4}•essfetnloFsraetroftyairin-eso&4-fcrfrfornrviotnl nFr..-6s Drmritg <br /> -- <br /> Date map was drawn t0-0-17 <br /> Instructions — <br /> ! _ - If you alresdy have a diagram that shows all required information_ you may include it, rather than this page, with your Monitoring System Cerci iication. On your site plan, <br /> shc•n t^ =_ general layout of tanks and piping. C+early identdy IDcafons of the following equipment, if installed: monhorng system central panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser parts, spill containers, mother secondary containment areas : mechanical or electronic lire leak detectors: and in-tank liquid level _ <br /> probes (-d used for leak detection). In the space provided, note the date this Site Plan was prepared, <br /> LEGEND <br /> -- - ,- - - - - - -- <br /> II I Ii I I � � II II _ <br /> � � I � 1 � 1- 1111 liTl � TIIIIII � � TIIIII � � <br />