Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring ventltransition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> Ll <br /> Site Address: KNIFE RIVER 655 CLAY STREET STOCKTON CA 95206 <br /> Ll <br /> i I-5 HIGHWAY <br /> A = ANl"ULAR <br /> F = FILLS <br /> T = TL'RBENE <br /> P = PROBE <br /> V = VAP <br /> X = SUMP SENSOR I A _ . . A _ - <br /> L = LeakDetector 6K . <br /> B = Brine Sensor . . . 20K ( �] <br /> I = Smart Sensor <br /> S = STP <br /> C = Floata & Chams <br /> H= HIGH FLOW . _ _ 87 _ <br /> S= SUCTION <br /> DIE(�P�J <br /> 8T_ <br /> DSLIWO <br /> . _ s <br /> *PD?l\G x <br /> (ARROWS) <br /> Dr- N-ins of piping <br /> exit aEumpand - <br /> UDC' s. -No SUCTION LINE. <br /> underground <br /> dran7xb is fig, _ _ _ - _ TLS <br /> speculate blue CE <br /> HI FLOW LIN' <br /> SbATER <br /> COOLER <br /> DIEFIIGHPUMP <br /> _ .q— .To Clay Street Entrance _ _ _ _ _ . <br /> Am itema Underground that are not s-iaible to the certifying technician are a proPeaaional opinion only and are solel`' for informational <br /> purposes. DraN'ing not to <br /> Date map was drawn :7-26-iJ <br /> Instructions <br /> If you already have a diagram that shows all required information. you may include it, rather than this page, Neth your Monitoring System Certification_ On your site plan , <br /> shcvr the general layout of tanks and piping. Clearly identify locations of the following equipment, if Installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces. sumps . dispenser pans. spill containers, or other secondary containment areas. mechanical or electronic line leak detectors: and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date- this Site Plan was prepared. <br /> LEGEND <br />