My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 4:41:50 PM
Creation date
7/28/2020 9:28:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6) <br /> VIII . MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? IN El <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, <br /> functionally tested, and confirmed operational ? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br /> their proper operation? FRI El F] <br /> Was monitoring system set-up reviewed to ensure proper settings? Q n <br /> Was the monitoring panel's backup battery visually inspected , functionally tested , and confirmed operational ? X F Ej <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? Q <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically <br /> disconnected ? El El FX] <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br /> Which sensors initiate positive shut down? (Check all that apply) <br /> E:1 Sump ❑ Under-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e.g . , modem) operational? X El El <br /> For any answer of "N" above, describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX . COMMENTS <br /> X. IN -TANK GAUGING TESTING <br /> QX Check this box if tank gauging is used only for inventory control . (Do not complete this section) <br /> ❑ Check this box if NO tank gauging equipment is installed . (Do not complete this section) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for <br /> round faults? <br /> Were all in4ank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally 1:1 1:1 El <br /> tested , and confirmed operational? <br /> Was accuracy of system's product level readings tested ? <br /> Was accuracy of system's water level readings tested? <br /> Were all probes reinstalled properly? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? 10 El ❑ <br /> For any answer of "N" above, describe in Section XI how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> Y = Yes, N = No, NA = Not Applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.