My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 9:36:52 AM
Creation date
7/28/2020 9:36:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 5 of 6) <br /> XII . LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? [21 ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified : 0 3 GPH ❑ 0 . 1 GPH ❑ 0.2 GPH <br /> Was the testing apparatus properly calibrated? ® ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected ? ❑ I ❑ 0 <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected ? g ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected ? ❑ 1 ❑ W <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ W1 <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ I ❑ 0 <br /> For electronic LLDs , have all accessible wiring connections been visually Inspected for kinks and breaks? ❑ I ❑ W1 <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ® ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ✓❑ ❑ ❑ <br /> For any answer of "N" above, describe in Section Xill how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> XIV. VACUUM i PRESSURE / HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> Check this box if VPH monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> SSensor Functionality Interstitial Communication <br /> ensor lD Component(S) Monitored 6y This Sensor <br /> Test Test <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail _❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was Interstitial communication verified ? Simulated Leak at Far Ends of the Interstitial Space El Visual Inspection <br /> ❑ Other (Describe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fall' above, describe in Section XV how and when these Issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH = Gallon Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = VacuumvPressurelHydrostatic, ID = Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.