My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 9:36:52 AM
Creation date
7/28/2020 9:36:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON .- <br /> E <br /> EN9 CM <br /> j <br /> A . SB 989 Repairs - SCOPE OF WORK <br /> 2 . Contractor shall at UDC # 1 /2 : <br /> • Recommend removing dispenser to gain access to fittings . <br /> • Remove all existing penetration and replace with ICON Fittings <br /> • Install new test boots on all product lines and vapor <br /> • Conduct per-air test on all secondary lines <br /> • Conduct hydrostatic pretest <br /> • Re- install dispenser and ensure working properly . <br /> 3 . Contractor shall at UDC # 3/4 : <br /> • Recommend removing dispenser to gain access to fittings . <br /> • Remove all existing penetration and replace with ICON Fittings <br /> • Install new test boots on all product lines and vapor <br /> • Conduct per-air test on all secondary lines <br /> • Conduct hydrostatic pretest <br /> • Re-install dispenser and ensure working properly <br /> 4 . Contractor shall at UDC # 5/6 : <br /> • Recommend removing dispenser to gain access to fittings . <br /> • Remove all existing penetration and replace with ICON Fittings <br /> • Install new test boots on all product lines and vapor <br /> • Conduct per-air test on all secondary lines <br /> • Conduct hydrostatic pretest <br /> • Re-install dispenser and ensure working properly <br /> 5 . Contractor shall at UDC # 7/8 : <br /> • Recommend removing dispenser to gain access to fittings . <br /> • Remove all existing penetration and replace with ICON Fittings <br /> • Install new test boots on all product lines and vapor <br /> • Conduct per-air test on all secondary lines <br /> • Conduct hydrostatic pretest <br /> • Re-install dispenser and ensure working properly <br /> 6 . Contractor shall at UDC # 9/ 10 : <br /> • Recommend removing dispenser to gain access to fittings . <br /> • Remove all existing penetration and replace with ICON Fittings <br /> • Install new test boots on all product lines and vapor <br /> • Conduct per-air test on all secondary lines <br /> • Conduct hydrostatic pretest <br /> • Re- install dispenser and ensure working properly <br /> 7 . Contractor Shall at 87 Turbine Sumps : <br /> • Remove all penetration and replace with ICON <br /> • Fiberglass tank collar to tank seam <br /> • Remove and replace test boots <br /> • Conduct Pre Air test <br /> • Conduct hydrostatic pretest . <br /> Please note that these dispensers are shallow Bravo <br /> N00 Commerce Drive: , Wes [ Sa ( famento , CA 95691 ( 916 ) 372 - 1888 Fax 373 - 1 172 <br /> Mailing ,4ddwI ,s : P . O . Box 1025) , West Sacrmywnlo, CA 95691 <br />
The URL can be used to link to this page
Your browser does not support the video tag.