Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels, 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> Site Address: VAN DE POL 351 N. BECKMAN ROAD LODI CA 95240 <br /> KEY HIGHFI'A1. 99 N <br /> A = ANNULAR <br /> F = FILLS TLS 360 <br /> T = TURBL`iE +PIPL\G } . <br /> P = PROBE (ARROR.S) . <br /> V = VAPOR Drew-iagofpiping CAS <br /> X = SMIPSENSOR exit of sump and <br /> L = LeakDetector UDC' s. Xo 000 0 . 1 1 <br /> M = 1\Lmvas• undereround . . . . VENTS . . <br /> B = Brine Sensor drawm4 is 2ZSJ1T4fw {ZC71 SL31P <br /> I = Smart Sensor jVscannot <br /> SSTP ;peculate blue <br /> C = Floats & C}iains p <br /> Xr E = E Stop <br /> OIL - - - - - - V � --� . . . . . . . . . . . . . . . . . . - - - - - - - <br /> - - . _ . . _ P <br /> 1 _ _ X L <br /> 3 P <br /> X <br /> P L q1 <br /> X <br /> X �.I I�C� �' � v <br /> L X <br /> X <br /> L X <br /> � _ X J <br /> . . . 361 N . BECKMAN ROAD <br /> S <br /> - 10 <br /> Mile item: underground that are fiat visible to the certihing tschnicfon are a <br /> prgrsssimtal apbdan on& mid are solei-for h1formational propos. Drmtvlg <br /> fiat to Ceuta <br /> Date map was drawh : 6-26-19 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, ratter than this page, with your hfonitoring System Certification. On your she plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels: sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secandary containment areas: mechanical or electronic line leak detectors: and in-tank liquid level <br /> probes (if used far teak detect;on). In the spam_ provided, note the date this Site Plan vias prepared. <br /> LEGEND <br /> I <br />