Laserfiche WebLink
Flohrschutz, Maribel [EHD] <br /> From: Flohrschutz, Maribel [EHD] <br /> Sent: Wednesday, August 12, 2020 8:20 AM <br /> To: Tiwana Group <br /> Subject: RE: report <br /> It seems that it will be a great inconvenience to properly finish floors under the soda fountain cabinet. Go ahead and <br /> seal bottom and side gaps of cabinet as to prevent trash, liquids, and debris to enter that area.The floor sink will still <br /> have to be accessible.The bottom of cabinet will need some type of base. Send me picture after work is completed. <br /> Make sure that before cabinet is sealed, floor is thoroughly cleaned. <br /> Maribel <br /> From:Tiwana Group<tiwanasubs@gmail.com> <br /> Sent:Tuesday, August 11, 2020 4:52 PM <br /> To: Flohrschutz, Maribel [EHD] <mflohrschutz@sjgov.org> <br /> Cc:Carruesco,Jeff[EHD]<jcarruesco@sjgov.org> <br /> Subject: Re: report <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> We can't use the attached as the base-board behind the soda machine. <br /> We have plumbing and soda lines attached to the soda machine. The cabinet can't be moved out; it will damage <br /> the water line and soda machine lines. They will need to cut lines and have coke re-attached which is really <br /> costly. Is there any alternative? Can we run the black base-board soda machine counter to block off any debris <br /> from entering? <br /> Vin <br /> On Tue, Aug 11,2020 at 8:13 AM Flohrschutz, Maribel [EHD] <mf1ohrschutzQs4og v_org> wrote: <br /> Vin, <br /> I spoke to my supervisor. He has approved the use of the floor material and the base only in the dining and soda <br /> fountain areas.The base in the soda fountain area will have to be caved with 3/8 inch radius(use slim foot ceramic <br /> tiles). Do not use these flooring or base material for the rest rooms. Current work will be approved if works looks <br /> acceptable, but inform the contractor that any new work will have to be up to code. <br /> You will still need to have the contractor do the repairs underneath the soda fountain cabinet at your March Ln <br /> location. <br /> 1 <br />