Laserfiche WebLink
PA-1900132 (SA) -3- <br /> flow rate for the 2-year, 24-hour storm. The hydromodification management plan <br /> shall be incorporated into the Project Stormwater Plan prior to clearance for plan <br /> check. <br /> e. Owner shall be responsible for providing the County with an annual report of <br /> operation and maintenance of any system.The property owner shall also be <br /> responsible for the payment to the County of an annual system inspection fee <br /> established by Resolution of the Board of Supervisors. <br /> f. A Maintenance Plan shall be submitted and the execution of a Maintenance <br /> Agreement with San Joaquin County shall be required for the owner/operator of <br /> stormwater controls prior to the release of the building permit. <br /> g. Standard Best Management Practices,for the type of development proposed, <br /> shall be incorporated into the site design. <br /> h. Wastewater shall NOT be allowed into the storm drainage system. <br /> JR: CH <br />