My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013466
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LONGE
>
7910
>
2600 - Land Use Program
>
PA-2000110
>
SU0013466
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2020 2:56:02 PM
Creation date
7/29/2020 1:24:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013466
PE
2634
FACILITY_NAME
PA-2000110
STREET_NUMBER
7910
Direction
S
STREET_NAME
LONGE
STREET_TYPE
ST
City
STOCKTON
Zip
95206-
APN
17726035
ENTERED_DATE
7/8/2020 12:00:00 AM
SITE_LOCATION
7910 S LONGE ST
RECEIVED_DATE
7/21/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE IMPROVEMENT PLAN <br /> STOCKTON METROPOLITAN AIRPORT <br /> •` � '`"' '• SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: PA- <br /> '6 <br /> TO BE COMPLETED BY THE APPLICANT PRIOR TO FILING THE APPLICATION <br /> Owner Information Applicant Information <br /> Name:Premier Finishing Name:Solar Gain West, LLC - John Reusche <br /> Address: 7910 Longe Street Address: 3750 Wilcox Road <br /> Stockton, CA 95206 Stockton CA 95215 <br /> Phone:(209) 982-5585 Phone: (209) 986-3412 <br /> PROJECT DESCRIPTION <br /> Proposal <br /> Description of the proposed project: <br /> Installation of 393.7 kW photovoltaic system with (1,064) solar panels. The system will be located on the grounds <br /> surrounding the existing building and will consist of(2) non-storage canopies & (1) non-storage ground mounted array <br /> Business name(DBA):Premier Finishing <br /> Employees/Customers per Work Shift <br /> Shift Hours Days of the week Lmployees(Number) Customers per Shift Vehicle Trips per Shift <br /> 7am - 5pm Monday - Friday 7 employees 0 customers 2 vehicles <br /> Materials/Equipment Used <br /> Describe equipment used in the project(include the number of automobiles and trucks): <br /> (2) trucks, (1)gradall/forklift, (2) manlift <br /> Describe materials produced,stored or used(all hazardous materials should be identifled): <br /> solar canopy for power generation only <br /> PROPERTY AND VICINITY DESCRIPTION <br /> Property Information <br /> Assessor Parcel Number(s) Property Size Number of Parcels Project Size Williamson Act Contract <br /> 17726035 [243,117 Sq Ft 1 40,000 Sq Ft ❑ Yes ® No <br /> Property Address: <br /> Existing Land Uses <br /> On-site Uses(Include Ag Crops): Premier Finishing (warehouse & office space) <br /> Uses to the North:Concrete tilt up warehouse - business <br /> Uses to the East:Buzz Oates Developed warehouse buildings <br /> 1= <br /> ses to the South:National Guard <br /> uses to the west:Concrete tilt up warehouse - business <br /> rADEVSVCIPIanning Applloatlon Formsl51te Improvement Plan, Page 2 of 8 <br /> Stkn Alrport.doc(Revised 08-26-09) <br />
The URL can be used to link to this page
Your browser does not support the video tag.