Laserfiche WebLink
SITE IMPROVEMENT PLAN <br /> STOCKTON METROPOLITAN AIRPORT <br /> •` � '`"' '• SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: PA- <br /> '6 <br /> TO BE COMPLETED BY THE APPLICANT PRIOR TO FILING THE APPLICATION <br /> Owner Information Applicant Information <br /> Name:Premier Finishing Name:Solar Gain West, LLC - John Reusche <br /> Address: 7910 Longe Street Address: 3750 Wilcox Road <br /> Stockton, CA 95206 Stockton CA 95215 <br /> Phone:(209) 982-5585 Phone: (209) 986-3412 <br /> PROJECT DESCRIPTION <br /> Proposal <br /> Description of the proposed project: <br /> Installation of 393.7 kW photovoltaic system with (1,064) solar panels. The system will be located on the grounds <br /> surrounding the existing building and will consist of(2) non-storage canopies & (1) non-storage ground mounted array <br /> Business name(DBA):Premier Finishing <br /> Employees/Customers per Work Shift <br /> Shift Hours Days of the week Lmployees(Number) Customers per Shift Vehicle Trips per Shift <br /> 7am - 5pm Monday - Friday 7 employees 0 customers 2 vehicles <br /> Materials/Equipment Used <br /> Describe equipment used in the project(include the number of automobiles and trucks): <br /> (2) trucks, (1)gradall/forklift, (2) manlift <br /> Describe materials produced,stored or used(all hazardous materials should be identifled): <br /> solar canopy for power generation only <br /> PROPERTY AND VICINITY DESCRIPTION <br /> Property Information <br /> Assessor Parcel Number(s) Property Size Number of Parcels Project Size Williamson Act Contract <br /> 17726035 [243,117 Sq Ft 1 40,000 Sq Ft ❑ Yes ® No <br /> Property Address: <br /> Existing Land Uses <br /> On-site Uses(Include Ag Crops): Premier Finishing (warehouse & office space) <br /> Uses to the North:Concrete tilt up warehouse - business <br /> Uses to the East:Buzz Oates Developed warehouse buildings <br /> 1= <br /> ses to the South:National Guard <br /> uses to the west:Concrete tilt up warehouse - business <br /> rADEVSVCIPIanning Applloatlon Formsl51te Improvement Plan, Page 2 of 8 <br /> Stkn Alrport.doc(Revised 08-26-09) <br />