My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013539
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1648
>
2600 - Land Use Program
>
PA-2000009
>
SU0013539
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2020 4:26:54 PM
Creation date
7/29/2020 2:02:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013539
PE
2632
FACILITY_NAME
PA-2000009
STREET_NUMBER
1648
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95215-
APN
14326015
ENTERED_DATE
7/24/2020 12:00:00 AM
SITE_LOCATION
1648 N SHAW RD
RECEIVED_DATE
7/13/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> Electric Company <br /> 11 . Cathodic Protection : PG & E pipelines are protected from corrosion with an " Impressed <br /> Current" cathodic protection system . Any proposed facilities , such as metal conduit , pipes , <br /> service lines , ground rods , anodes , wires , etc . that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PG & E Corrosion Engineering . <br /> 12 . Pipeline Marker Signs : PG & E needs to maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines . <br /> With prior written approval from PG & E Pipeline Services , an existing PG & E pipeline marker sign <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction work . The pipeline marker must be moved back once construction is <br /> complete . <br /> 13 . PG & E is also the provider of distribution facilities throughout many of the areas within <br /> the state of California . Therefore , any plans that impact PG & E ' s facilities must be reviewed and <br /> approved by PG & E to ensure that no impact occurs which may endanger the safe operation of <br /> its facilities . <br /> PG & E Gas and Electric Facilities Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.