Laserfiche WebLink
Monitoring System Certification <br />UST Monitoring Site Plan <br />AUG 1 401) <br />ENVIRUNIVItIm <br />Site Address: 1789 W CHARTER WAY STOCKTON, CA -�r A "€-fi��E <br />m <br />.............................. <br />O <br />.............................. <br />V <br />.............................. <br />.............................. <br />A <br />91 <br />_�ft€rsL rrra�a gr craa�tlxst e�: � r -rot �yisitr}€tot}k e€�2�rrtg tAMieFnrr me a <br />pt-of€ssior�rlo�raanar�c•crr�•trat s;,�€�:=frr�-fravr�rszrtior�r}�enpcc€s_ Z?a•mffwg <br />axat t� seeu's <br />*PIPING <br />(ARROWS) <br />Drawing of piping <br />exit of sump and <br />UDC's. No <br />underground <br />drawing is <br />accurate, we <br />cannotspeculate <br />blue prints. <br />Date map was drawn03/28/18 <br />Instructions <br />If you already have a diagram that shows aII required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification <br />2/21 /07 <br />Page 4 of 4 <br />