Laserfiche WebLink
5.0 SOIL PROFILE INFORMATION SECTION <br /> 5.1 Site map showing the location,with dimensions, of the soil profiled pit on the parcel. See <br /> Appendix. <br /> 5.2 Description of soil profile pit including depth and dimensions. The shallow test holes <br /> were prepared per County Standards. The holes were excavated to a depth of 42 inches and 10 <br /> inches in diameter. The holes were backfilled with 2 inches of"pea gravel". <br /> 5.3 Description of soil lithology as noted from test pit by appropriate professional using <br /> industry standard protocol. The Soil in this area is classified as San Joaquin Sandy loam and <br /> as stated in the Soil Survey of San Joaquin County, as provided by the United States Department <br /> of Agriculture, Soil Conservation Service. <br /> 5.4 Discussion of soil lithology as related to future onsite septic uses: The San <br /> Joaquin Sandy loam has a permeability that is very slow. <br /> 6.0 PERCOLATION TEST INFORMATION SECTION <br /> 6.1 Site map showing the location,with concise and accurate dimensions of the percolation <br /> test holes on the parcel: See Appendix. <br /> 6.2 The minimum number of shallow and deep percolation tests were performed for each <br /> parcel: One shallow percolation test hole was prepared on Parcel 1. Another hole was later <br /> prepared for Parcel 2 per the attached Tentative Map. <br /> 6.3 Description of the date, time and protocol used to prepare the test hole, including <br /> depth and dimensions of hole, preparation of hole, and depth of water used to presoak <br /> (minimum 12 inches): The shallow test hole was excavated to a depth of 42 inches and 10 inches <br /> in diameter and backfilled with 2 inches of "pea gravel" in accordance with County Standards. <br /> The shallow hole was prepared by Mike Toy of Dillon & Murphy on June 12, 2020 at 7:30 a.m. <br /> On June 15, 2020 at 7:30 a.m., the 24 hour presoak period was started. The hole was filled with <br /> 12 inches of water over the gravel at this time. A second test hole was prepared by Mike Toy of <br /> Dillon& Murphy on September 25, 2020. The test hole was prepared in accordance with County <br /> Standards. On September 28, 2020 at 7:30 a.m.,the 24 hour presoak period was started. The hole <br /> was filled with 12 inches of water over the gravel at this time. <br /> 6.4 Description of the date, time and condition of the test hole after the 24-hour soak period <br /> (hole still intact,hole dry,preparation of hole,and depth of water used to presoak(minimum <br /> 12 inches): On June 16, 2020 at 7:30 a.m., the 1 shallow test hole was dry. Six inches of water <br /> was added to the hole and the hole was deemed suitable to continue. The shallow test passed the <br /> minimum County requirements. On September 29, 2020 at 7:30 a.m., the shallow test hole was <br /> dry. Six inches of water was added to the hole and the hole was deemed suitable to continue. The <br /> shallow hole passed the minimum County Standards. <br /> 6.5 The test conformed to SJC Policy EH 02-02 (correct depth,diameter,2" gravel,6" water <br /> refill,correct readings recorded). The percolation tests conformed to San Joaquin County Policy <br /> EHD 02-02. <br /> 3 <br />