|
of this paragraph,a hazardous waste eseeeds 5 percent of required to be prepared by September 1, 1995, and every
<br /> the total yearly volume, and is subject to this article, if it four years thereafter, pursuant to subdivision (a).
<br /> is routinely generated on an ongoing basis and meets (B) Any generator that is subject to this program
<br /> either of the following criteria: pursuant to paragraph (3) of subdivision (d) of Section -
<br /> (A) It is a hazardous waste stream processed in a 25244.15, and was not subject to this program before
<br /> wastewater treatment unit which discharges to a publicly January 1, 1993, shall be required to prepare its source
<br /> owned treatment works or under a national pollutant reduction evaluation review and plan, or compliance check
<br /> discharge elimination system (NPDES) permit, as list, as provided in paragraph (3) of subdivision (d) of
<br /> specified in the Federal Water Pollution Control Act, as Section 25244.15,on September 1, 1993, and every four
<br /> amended (33 U.S.C. Sec. 1251 and following), and its years thereafter.
<br /> weight before treatment exceeds 5 percent of the weight (10) (A) Any generator subject to this article shall
<br /> of the total yearly volume at the site. submit to the department a progress report as part of its
<br /> (B) It is a hazardous waste stream which is not submittal of a biennial report on March 1 of each
<br /> processed in a wastewater treatment unit and its weight even-numbered year pursuant to Section 66262.41 of Title
<br /> exceeds 5 percent of the weight of the total yearly volume 22 of the California Code of Regulations. If the generator
<br /> at the site,less the weight of any hazardous waste stream is not required to submit a biennial report pursuant to that
<br /> identified in subparagraph (A). regulation, it shall prepare a separate progress report on
<br /> (4) For each hazardous waste stream identified in the same time schedule required for the biennial report.
<br /> paragraph(3),the review and plan shall include all of the Generators not required to submit a-biennial report shall
<br /> following information: not be required to submit their prepared progress report.
<br /> (A) An estimate of the quantity of hazardous waste However, the progress report shall be subject to the
<br /> generated. requirements applicable to reports under Section 25244.21.
<br /> (B) An evaluation of source reduction approaches Progress reports shall address plan implementation
<br /> available to the generator which are potentially viable. activities undertaken by the generator during the two years
<br /> The evaluation shall consider at least all of the following preceding the year in which the biennial report is required
<br /> source reduction approaches: to be submitted.
<br /> (i) Input change. (B)The progress report shall briefly summarize and,
<br /> (ii) Operational improvement, to the extent practicable, quantify, in a manner which is
<br /> (iii) Production process change. understandable to the general public, the results of
<br /> (iv) Product reformulation. implementing the source reduction methods identified in
<br /> (5) A specification of, and a rationale for, the the generator's source reduction evaluation, review, and `
<br /> technically feasible and economically practicable source plan for each waste stream addressed by that plan. The
<br /> reduction measures which will be taken by the generator progress report due on March 1, 1994, and every other
<br /> with respect to each hazardous waste stream identified in progress report thereafter,shall also include an estimate of
<br /> paragraph (3). The review and plan shall fully document the amount of reduction the generator anticipates will be
<br /> any statement explaining the generator's rationale for achieved by the implementation of source reduction
<br /> rejecting any available source reduction approach methods during the period between the preparation of the
<br /> identified in paragraph (4). progress report and the preparation of its next progress
<br /> (6) An evaluation, and, to the extent practicable, a report.This estimate shall not require any new evaluation,
<br /> quantification, of the effects of the chosen source review, or planning, but shall be based upon the
<br /> reduction method on emissions and discharges to air, generator's existing source reduction, evaluation, review,
<br /> water, or land. - and plan and upon the waste reduction results in the
<br /> (7) A timetable for making reasonable and progress report. The department shall prepare a form
<br /> measurable progress towards implementation of the which may be used as a convenient and expeditious
<br /> selected source reduction measures specified in paragraph method for generators to comply with the progress report
<br /> (5). requirements of this section. The department shall hold at
<br /> (8) Certification pursuant to subdivision (e). least one public workshop concerning the development of
<br /> (9)Any generator subject to this article shall include the form.
<br /> in its source reduction evaluation review and plan (c) The source reduction evaluation review and plan
<br /> four-year numerical goals for reducing the generation of summary required by subdivision (a) shall be completed
<br /> hazardous waste streams through the approaches provided in accordance with the format adopted pursuant to
<br /> for in subparagraph (B) of paragraph (4), based upon its subdivision (a) of Section 25244.19 and shall include the
<br /> best estimate of what is achievable in that four-year information specified in paragraphs (1), (2), (3), and (6)
<br /> period, as follows: of subdivision (b) and a summary of the information
<br /> (A) For those generators and waste streams subject required pursuant to paragraphs(4) and(5) of subdivision
<br /> to this program prior to January 1, 1993, the four-year (b).
<br /> numerical goals shall be included in the plan which is (d) If a generator owns or operates multiple sites
<br /> with similar processes,operations,and waste streams,the
<br /> Page 164
<br />
|