Laserfiche WebLink
of this paragraph,a hazardous waste eseeeds 5 percent of required to be prepared by September 1, 1995, and every <br /> the total yearly volume, and is subject to this article, if it four years thereafter, pursuant to subdivision (a). <br /> is routinely generated on an ongoing basis and meets (B) Any generator that is subject to this program <br /> either of the following criteria: pursuant to paragraph (3) of subdivision (d) of Section - <br /> (A) It is a hazardous waste stream processed in a 25244.15, and was not subject to this program before <br /> wastewater treatment unit which discharges to a publicly January 1, 1993, shall be required to prepare its source <br /> owned treatment works or under a national pollutant reduction evaluation review and plan, or compliance check <br /> discharge elimination system (NPDES) permit, as list, as provided in paragraph (3) of subdivision (d) of <br /> specified in the Federal Water Pollution Control Act, as Section 25244.15,on September 1, 1993, and every four <br /> amended (33 U.S.C. Sec. 1251 and following), and its years thereafter. <br /> weight before treatment exceeds 5 percent of the weight (10) (A) Any generator subject to this article shall <br /> of the total yearly volume at the site. submit to the department a progress report as part of its <br /> (B) It is a hazardous waste stream which is not submittal of a biennial report on March 1 of each <br /> processed in a wastewater treatment unit and its weight even-numbered year pursuant to Section 66262.41 of Title <br /> exceeds 5 percent of the weight of the total yearly volume 22 of the California Code of Regulations. If the generator <br /> at the site,less the weight of any hazardous waste stream is not required to submit a biennial report pursuant to that <br /> identified in subparagraph (A). regulation, it shall prepare a separate progress report on <br /> (4) For each hazardous waste stream identified in the same time schedule required for the biennial report. <br /> paragraph(3),the review and plan shall include all of the Generators not required to submit a-biennial report shall <br /> following information: not be required to submit their prepared progress report. <br /> (A) An estimate of the quantity of hazardous waste However, the progress report shall be subject to the <br /> generated. requirements applicable to reports under Section 25244.21. <br /> (B) An evaluation of source reduction approaches Progress reports shall address plan implementation <br /> available to the generator which are potentially viable. activities undertaken by the generator during the two years <br /> The evaluation shall consider at least all of the following preceding the year in which the biennial report is required <br /> source reduction approaches: to be submitted. <br /> (i) Input change. (B)The progress report shall briefly summarize and, <br /> (ii) Operational improvement, to the extent practicable, quantify, in a manner which is <br /> (iii) Production process change. understandable to the general public, the results of <br /> (iv) Product reformulation. implementing the source reduction methods identified in <br /> (5) A specification of, and a rationale for, the the generator's source reduction evaluation, review, and ` <br /> technically feasible and economically practicable source plan for each waste stream addressed by that plan. The <br /> reduction measures which will be taken by the generator progress report due on March 1, 1994, and every other <br /> with respect to each hazardous waste stream identified in progress report thereafter,shall also include an estimate of <br /> paragraph (3). The review and plan shall fully document the amount of reduction the generator anticipates will be <br /> any statement explaining the generator's rationale for achieved by the implementation of source reduction <br /> rejecting any available source reduction approach methods during the period between the preparation of the <br /> identified in paragraph (4). progress report and the preparation of its next progress <br /> (6) An evaluation, and, to the extent practicable, a report.This estimate shall not require any new evaluation, <br /> quantification, of the effects of the chosen source review, or planning, but shall be based upon the <br /> reduction method on emissions and discharges to air, generator's existing source reduction, evaluation, review, <br /> water, or land. - and plan and upon the waste reduction results in the <br /> (7) A timetable for making reasonable and progress report. The department shall prepare a form <br /> measurable progress towards implementation of the which may be used as a convenient and expeditious <br /> selected source reduction measures specified in paragraph method for generators to comply with the progress report <br /> (5). requirements of this section. The department shall hold at <br /> (8) Certification pursuant to subdivision (e). least one public workshop concerning the development of <br /> (9)Any generator subject to this article shall include the form. <br /> in its source reduction evaluation review and plan (c) The source reduction evaluation review and plan <br /> four-year numerical goals for reducing the generation of summary required by subdivision (a) shall be completed <br /> hazardous waste streams through the approaches provided in accordance with the format adopted pursuant to <br /> for in subparagraph (B) of paragraph (4), based upon its subdivision (a) of Section 25244.19 and shall include the <br /> best estimate of what is achievable in that four-year information specified in paragraphs (1), (2), (3), and (6) <br /> period, as follows: of subdivision (b) and a summary of the information <br /> (A) For those generators and waste streams subject required pursuant to paragraphs(4) and(5) of subdivision <br /> to this program prior to January 1, 1993, the four-year (b). <br /> numerical goals shall be included in the plan which is (d) If a generator owns or operates multiple sites <br /> with similar processes,operations,and waste streams,the <br /> Page 164 <br />