Laserfiche WebLink
BASE LAYER LAYER#1 <br /> S.o� ._. ._. ._. ._. ._. ._. ._. ._. ._. ._. ._. ._. ._. . . .� <br /> CHAMBER #1 CHROME RINSES WASTE WATER FLOW FROM RINSE TANKS TO SEWER <br /> CHAMBER #2 ALL OTHER RINSES FROM WASTE TREATMENT UNITTO TANK#10 FOR FINAL <br /> CHAMBER #3 FLOCCULATION P.H.ADJUSTMENT THEN TO SUMP#12 THEN OUT TO SEWER. <br /> CHAMBER.#4 P.H. ADJUSTMENT LAYER#2 <br /> #5 LIFT STATION FOR CHROME <br /> RINSES CHROME RINSES GO INTO TREATMENT UNIT <br /> #6 LIFT STATION FOR ALL OTHER FOR PROCESSING IN CASE OF AN EMERGENCY <br /> RINSES BYPASS VALVE WILL BE USED <br /> #7 FILTER PRESS TO PUMP SOLUTION INTO HOLDING TANK#9 <br /> #8 HOLDING TANK FOR ALL OTHER WHERE IT WILL BE LATER PUMPED BACK INTO <br /> RINSES TREATMENT UNIT FOR PROCESSING <br /> #9 HOLDING TANK FOR CHROME ' EMERGENCY BYPASS VALVES <br /> RINSES LAYER#4 <br /> #10 FINAL P.H. ADJUSTMENT SLUDGE FLOW EXCESS WATER RETURN <br /> #11 REFRIGERATED SAMPLER -- -- -- - > —> <br /> STATION SLUDGE GOES FROM BOTTOM OF CHAMBER#4 <br /> #12 OUT GONIG SUMP TO SEWER OF WASTE TREATMENT UNIT INTO FILTER PRESS <br /> #13 AIR PUMP EXCESS WATER IS PUMPED BACK INTO CHAMBER <br /> #14 AIR PUMP #2 OF WASTE TREATMENT UNIT FOR TREATMENT <br /> #15 AIR PUMP EMERGENCY BYPASS VALVES <br /> #16 G.P.M. AND P.H. CONTROL LAYER#3 <br /> UNITS <br /> #17 CON ICLE TANK ALL RINSES ARE PUMPED INTO TREATMENT UNIT <br /> #18 HOLDING TANK IN CASE OF EMERGENCY TREATMENT UNIT WILL <br /> #19 RINSE STATION FOR EMPTY BE BYPASSED AND PUMPED INTO HOLDING TANK#8 <br /> DRUMS ! AND THEN LATER BACK INTO TREATMENT UNIT FOR <br /> PROCESSING. <br /> JEMERGENCY BYPASS VALVES <br /> U) <br /> w <br /> U) <br /> z <br /> ¢ i w�! <br /> w mow. <br /> ¢i ¢Z.' ' <br /> cr <br /> cr <br /> w . <br /> i M <br /> z O� <br /> 1 ! <br /> J <br /> 0 1 <QI <br /> Z <br /> 1 i ' <br /> 1 i i 18 <br /> i <br /> n17 <br /> ■ 5 <br /> i 1 6 <br /> -owl 8 <br /> 1 <br /> WASTE TREATMENT UNIT .• 15 9 <br /> 10 <br /> E19 <br /> 11 12 <br /> OUT O <br /> SEWER <br />