Laserfiche WebLink
BASE LAYER LAYER#I <br /> _. ,_. ._. ._. ,_. ,_. ,_. ,_, ._. ._. ,_, ._. ._. ,. <br /> CHAMBER #1 CHROME RINSES WASTE WATER FLOW FROM RINSE TANKS TO SEWER <br /> CHAMBER #2 ALL OTHER RINSES FROM WASTE TREATMENT UNITTO TANK#10 FOR FINAL <br /> CHAMBER #3 FLOCCULATION P.H.ADJUSTMENT THEN TO SUMP#12 THEN OUT TO SEWER. <br /> CHAMBER-#4 P.H. ADJUSTMENT LAYER#2 <br /> #5 LIFT STATION FOR CHROME <br /> RINSES CHROME RINSES GO INTO TREATMENT UNIT <br /> #6 LIFT STATION FOR ALL OTHER FOR PROCESSING IN CASE OF AN EMERGENCY <br /> RINSES BYPASS VALVE WILL BE USED <br /> #7 FILTER PRESS TO PUMP SOLUTION INTO HOLDING TANK #9 <br /> #8 HOLDING TANK FOR ALL OTHER WHERE IT WILL BE LATER PUMPED BACK INTO <br /> RINSES TREATMENT UNIT FOR PROCESSING <br /> #9 HOLDING TANK FOR CHROME ' EMERGENCY BYPASS VALVES <br /> RINSES LAYER#4 <br /> #10 FINAL P.H. ADJUSTMENT SLUDGE FLOW EXCESS WATER RETURN <br /> #11 REFRIGERATED SAMPLER -- -- - --> <br /> STATION SLUDGE GOES FROM BOTTOM OF CHAMBER#4 <br /> #12 OUT GONIG SUMP TO SEWER OF WASTE TREATMENT UNIT INTO FILTER PRESS <br /> #13 AIR PUMP EXCESS WATER IS PUMPED BACK INTO CHAMBER <br /> #2 OF WASTE TREATMENT UNIT FOR TREATMENT <br /> #14 AIR PUMP 1 EMERGENCY BYPASS VALVES <br /> #15 AIR PUMP <br /> #16 G.P.M. AND P.H. CONTROL LAYER #3 <br /> UNITS <br /> #17 CONICLE TANK ALL RINSES ARE PUMPED INTO TREATMENT UNIT <br /> #18 HOLDING TANK IN CASE OF EMERGENCY TREATMENT UNIT WILL <br /> #19 RINSE STATION FOR EMPTY BE BYPASSED AND PUMPED INTO HOLDING TANK#B <br /> DRUMS ! ! AND THEN LATER BACK INTO TREATMENT UNIT FOR <br /> i PROCESSING. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />