My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MURPHY
>
17200
>
2231-2238 – Tiered Permitting Program
>
PR0546073
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2020 3:00:46 PM
Creation date
7/30/2020 7:43:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0546073
PE
2234
FACILITY_ID
FA0007695
FACILITY_NAME
SAN JOAQUIN COGEN LLC
STREET_NUMBER
17200
STREET_NAME
MURPHY
STREET_TYPE
PKWY
City
LATHROP
Zip
95330
APN
19812005
CURRENT_STATUS
02
SITE_LOCATION
17200 MURPHY PKWY
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\H\HARLAN\17200\PR0546073\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EPA ID NUMBER 64 L CX. 17 3 07 `( <br /> TRANSPORTABLE TREATMENT UNIT PERMIT-BY-RULE <br /> SITE-SPECIFIC NOTIFICATION <br /> VIII. BASIS FOR NOT NEEDING A FEDERAL PERMIT <br /> ❑ 6. The waste is treated in an accumulation tank or container within 90 days for over 1000 kglmonth generators and <br /> 180 or 270 days for generators of 100 to 1000 kg/month. 40 CFR 262.34, 40 CFR 270.1(c)(2)(i), and the <br /> Preamble to the March 24, 1986 Federal Register. <br /> ❑ 7. Recyclable materials are reclaimed to recover economically significant amounts of silver or other precious <br /> metals. 40 CFR 261.6(a)(2)(iv), 40 CFR 264.1(g)(2), and 40 CFR 266.70. <br /> ❑ 8. Empty container rinsing and/or treatment. 40 CFR 261.7. <br /> ❑ 9. Other. Specify: <br /> LY. ATTACHMENTS: <br /> ® A. A plot plan/map detailing where the hazardous waste treatment will occur. - <br /> ® B. A certification specifying the local agencies that have been notified of the operation. <br /> ® C. A copy of any local air district permit or other permits required for the operation of the TTU. <br /> ❑ D. Documentation that the facility operator has notified the property owner of the operation of the unit. <br /> (Required only when the property owner is different from the generator/operator.) <br /> Check this box if the generator is also the property owner. <br /> ❑ E. Generator's waste minimizationcertificationas specified in Title 22, CCR, Section 66262.45, if applicable. <br /> ❑ F. The Phase I Environmental Assessment Checklist, if applicable. The Phase I Environmental Assessment <br /> Checklist is only be required if the TTU owner/operator is the gencra.or of the waste. The Phase I <br /> Environmental Assessment Checklist must be submitted by January 1, 1997, or within one year of the date <br /> when the PBR TTU ownerloperator is initially authorized to operate at the site, whichever date is later. <br /> ® G. The containment system certifications required by Title 22, CCR, sections 66264.175(c) for containers <br /> containment systems, if applicable. <br /> DTSC Form 1107(1196) Page 8 <br /> (Ret vimsly DTSC 9429A) <br />
The URL can be used to link to this page
Your browser does not support the video tag.