Laserfiche WebLink
PETE WILSON.Governor <br /> STATE OF CALIFORNIA ENVIRONMENTAL PROTECTION AGENCY <br /> DEPARTMENT OF TOXIC SUBSTANCES CONTROL <br /> 400 P Street,4th Floor i <br /> P.O. Box 806 <br /> Sacramento.CA 95812-0806 <br /> (916) 323-5871 07/08/93 <br /> EPA ID: CAD009118910 <br /> NESTLE BEVERAGE COMPANY, RIPON SITE Forfacility located at: <br /> JOHN MELING <br /> 230 INDUSTRIAL AVENUE 230 INDUSTRIAL AVENUE <br /> RIPON, CA 95366 RIPON, CA 95366 <br /> Authorization Date: 07/08/93 <br /> Dear Permit by Rule Facility: <br /> AUTHORIZATION TO OPERATE A FTU PURSUANT TO PERMIT BY RULE <br /> The Department of Toxic Substances Control (DTSC) has received your facility specific notification(form <br /> DTSC 1772)and permit by rule unit specific notification(s) (form DTSC 1772D). Your notifications are <br /> administratively complete, but have not been reviewed for technical adequacy. A technical review of your notifications <br /> will be conducted when an inspection is performed. At any time, you may be inspected and will be subject to penalty if <br /> violations of laws or regulations are found. <br /> Pursuant to Title 22, California Code of Regulations (CCR), section 67450.2(b)(5), you are hereby authorized <br /> to operate the fixed treatment unit(s) listed on the last page of this letter under permit by rule. Your authorization to <br /> operate under permit by rule expires one year after the authorization date shown above unless the Department changes <br /> your period of authorization in writing pursuant to Title 22, CCR, section 67450.3(c)(1). <br /> You must renotify the Department annually under the current Permit by Rule regulations either by March 1 or <br /> when requested by DTSC to renotify. Renewal packages will be sent to all operators of permit by rule units on or about <br /> February 1 of each subsequent year. <br /> You must notify the DTSC 60 days before first treating hazardous wastes in any new unit. You must also <br /> notify the DTSC whenever any of the information you provided in these notifications changes. To revise information, <br /> mail a cover letter to the above address explaining the changes, attach only the pages of your notification package that <br /> have changed, and re-sign and date at the signature space on page 3 of form 1772. <br /> As ad forth in Title 22, CCR, section 67450.9(c), this authorization is contingent upon the accuracy of <br /> information submitted by you in the notifications mentioned above. Any misrepresentation or any failure to fully <br /> disclose all relevant facts shall render this authorization to operate null and void. <br /> You will be charged annual fees calculated on a calendar year basis for each year you operate and have not <br /> notified DTSC of the closure of the unit(s). Facilities are required to implement the closure plan and close the PBR <br /> treatment units(s)within 90 days of treating the last volume of hazardous waste (CCR 67450.3 (c)(12)(D)). You are <br /> also required to notify the DTSC 15 days prior to the completion of the closure of any PBR unit or facility (CCR <br /> 67450.3 (c)(12)(17)). The facility must stay in compliance with all regulations until the certification required by CCR <br /> 67450.3 (c)(12)(G) is submitted. Additional guidance on closure will be issued and distributed to all authorized onsite <br /> facilities later this year. <br /> Lar <br />