My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL PARK
>
544
>
2231-2238 – Tiered Permitting Program
>
PR0546075
>
COMPLIANCE INFO_1993 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 11:18:37 AM
Creation date
7/30/2020 7:44:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993 - 2017
RECORD_ID
PR0546075
PE
2231
FACILITY_ID
FA0026057
FACILITY_NAME
OLIN INTERCONNECT TECHNOLOGIES
STREET_NUMBER
544
STREET_NAME
INDUSTRIAL PARK
STREET_TYPE
DR
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
544 INDUSTRIAL PARK DR
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\I\INDUSTRIAL PARK\544\PR0546075\COMPLIANCE INFO 1993 - 2017.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2 - EQUALIZATION TANK <br /> self pn'min) <br /> C�n/rifZi�'a/pumps. � J %o pH r I ad�usl• Tank <br /> Z"True union <br /> N/aS�P NIdfEY i 5 i _ - (xy//Ya/VfS <br /> TYLMS �"YCCI to EcyuaI. Woier e&- Euro Frrm <br /> Tan/ rYtm Lift S.�han � PN y3 Rc�just. Tank <br /> Kdri F/oaf 5wid�{�r5 Z"Pmf ud/✓C5 <br /> ,4 <br /> 30Gt� Gc+licn Stee/ f«r1�d Tcrn,� <br /> Figure 3-3 Equalization tank <br /> 2 . 1 Equipment list: lEa. 3000 gallon steel coated tank <br /> 2Ea. Self priming centrifugal pump <br /> (Model: GNOK 1 1/2 / 2DL-. 5C) <br /> 2Ea. 2" true union ball valves <br /> 2Ea. 2" foot valves <br /> lEa. Kari float switch (Model: 4Y5E) <br /> Wastewater is pumped from the lift <br /> station to be stored at the equal . <br /> tank for treatment transfer. <br /> 2 . 2 Pump operation 1. The level of the wastewater in the <br /> equalization tank rises to the first <br /> stage of the Kari float switch. The <br /> Kari float switch energizes one of <br /> the self priming centrifugal pump. <br /> (Figure 3-3) . <br /> 2 . If the first pump fails to hold the <br /> water level in the equalization tank <br /> down, the water level will reach <br /> the second stage of the Kari float <br /> switch which energizes the second pump. <br /> 3 . If both the first and the second pump <br /> fail to hold the wastewater level in <br /> the equalization tank down, the <br />
The URL can be used to link to this page
Your browser does not support the video tag.