My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL PARK
>
544
>
2231-2238 – Tiered Permitting Program
>
PR0546075
>
COMPLIANCE INFO_1993 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 11:18:37 AM
Creation date
7/30/2020 7:44:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993 - 2017
RECORD_ID
PR0546075
PE
2231
FACILITY_ID
FA0026057
FACILITY_NAME
OLIN INTERCONNECT TECHNOLOGIES
STREET_NUMBER
544
STREET_NAME
INDUSTRIAL PARK
STREET_TYPE
DR
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
544 INDUSTRIAL PARK DR
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\I\INDUSTRIAL PARK\544\PR0546075\COMPLIANCE INFO 1993 - 2017.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
When the pH ranges from 9 . 5 to 14 ,the <br /> pH probe #3 will send a signal to the <br /> pH monitor #3 on the electrical panel <br /> which will energize: Both the acid <br /> metering pump #3 to adjust the pH and <br /> 3-way diverting valve to open for the <br /> wastewater to flow back to the equal. <br /> tank for further treatment. <br /> Kari Floor <br /> SwiKh <br /> 150o Goll0-n Cau3hG <br /> Tann caustic Nh ldCn <br /> 2•�tJArYShu!-o!� Pun>w <br /> s <br /> CouS+iC <br /> ✓alye- 9 q <br /> � Alr eeoJu/aror,5 . � ✓a/rP ,/al✓R- <br /> i <br /> 3-way 5`way 3-Wary <br /> 501BnO/ol✓alp A�V)VfP solet,)O(d ✓a/vim <br /> PH+l +dj. Tank pN♦z Adj. TanL pN,44 ntij. TaNL <br /> Figure 3-5 Caustic tank <br /> 3 . 4 Caustic feed The 2-way air solenoid valve is <br /> operation energized by the Kari float switch' s <br /> signal from the equalization tank. <br /> The supply air flows through the 2-way <br /> air solenoid valve and filter/reg- <br /> ulator/lubricator set to operate the <br /> air diagram Wilden pump. If there is no <br /> caustic feeding demand,the air diagram <br /> Wilden pump just circulates the <br /> caustic solution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.