My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL PARK
>
544
>
2231-2238 – Tiered Permitting Program
>
PR0546075
>
COMPLIANCE INFO_1993 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 11:18:37 AM
Creation date
7/30/2020 7:44:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993 - 2017
RECORD_ID
PR0546075
PE
2231
FACILITY_ID
FA0026057
FACILITY_NAME
OLIN INTERCONNECT TECHNOLOGIES
STREET_NUMBER
544
STREET_NAME
INDUSTRIAL PARK
STREET_TYPE
DR
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
544 INDUSTRIAL PARK DR
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\I\INDUSTRIAL PARK\544\PR0546075\COMPLIANCE INFO 1993 - 2017.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alin <br /> NTERCONNECT TECHNOLOGIES <br /> P.O. BOX 952 (95336), 555 CARNEGIE ST, MANTECA, CA 95337 <br /> (209) 824-1166 FAX (209) 239-2660 <br /> January 25, 1996 <br /> CERTIFIED MAIL-- <br /> RETURN RECEIPT REQUESTED <br /> Mr. Sangat Kalf <br /> Department of Toxic Substances Control <br /> Hazardous Waste Management Program F'" <br /> P.O. Box 806 `°" q� `, LL U <br /> Sacramento, CA 95812-0806 JAN 3 0 1996 <br /> ENVIRONMEiN IAL HEALTH <br /> RE: PBR Closure Certification PERMIT/SERVICES <br /> 544 Industrial Park Drive <br /> Manteca, California <br /> EPA. I.D. No: CAL-930-603-608 <br /> Dear: Mr. Kalf: <br /> As stated in our letter of October 6, 1995, the final volume of wastewater was treated in <br /> the subject PBR wastewater treatment system on September 18, 1995. All closure <br /> activities were completed by early December 1995. No calcium compounds were <br /> managed in the wastewatertreatment sytem. As shown in the attached table, metals <br /> concentrations measured in soil samples are typical of soils in the San Francisco Bay <br /> area. <br /> Attached is the report prepared and signed by an independent, California professional <br /> engineer certifying that closure has been completed in accordance with the closure plan. <br /> As further required by 67450.3(c)(1 2)(G): <br /> I certify under penalty of law that this document and all attachments were prepared <br /> under my direction or supervision in accordance with a system designed to assure <br /> that qualified personnel properly gather and evaluate the information submitted. <br /> Based on my inquiry of the person or persons who manage the system, or those <br /> persons directly responsible for gathering the information, the information <br /> submitted is, to the best of my knowledge and belief, true, accurate, and complete. <br /> I am aware that there are significant penalties for submitting false information, <br /> including the possibility of fine and imprisonment for knowing violations. <br /> The Leader in Advanced Interconnect Technology <br />
The URL can be used to link to this page
Your browser does not support the video tag.