My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL PARK
>
544
>
2231-2238 – Tiered Permitting Program
>
PR0546075
>
COMPLIANCE INFO_1993 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 11:18:37 AM
Creation date
7/30/2020 7:44:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993 - 2017
RECORD_ID
PR0546075
PE
2231
FACILITY_ID
FA0026057
FACILITY_NAME
OLIN INTERCONNECT TECHNOLOGIES
STREET_NUMBER
544
STREET_NAME
INDUSTRIAL PARK
STREET_TYPE
DR
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
544 INDUSTRIAL PARK DR
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\I\INDUSTRIAL PARK\544\PR0546075\COMPLIANCE INFO 1993 - 2017.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The structural assessments are to examine the structural strength <br /> and stability of the tanks due to hydrostatic pressure and lateral <br /> load in the case of an earthquake. The seismic loads applied to <br /> the tanks are based on the requirements in Section 2338 of 1991 <br /> UBC. The allowable working stresses in tank walls are in accordance <br /> with the " Manual of Steel Construction" , AISC. , and with the <br /> Polyolefin Tank Data provided by the manufacturer. <br /> The conclusion of this report is made based on: <br /> 1. Visual Inspection, 2/23/93 <br /> 2 . Review of Rinse Tank Platform Modification Plans prepared <br /> by Ehrlich-Rominger Architects, dated 11/12/92 <br /> 3 . Polyolefin and Steel Tanks Data Sheets, Attachments Al <br /> through A8 <br /> 4 . Structural Calculations for Tank Certification of MQUAD <br /> Waste Treatment, dated 3/16/93 <br /> 5 . Modification Plans S1 through S6 <br /> 6 . Final Inspection, 3/26/93 <br /> The findings and the recommended modifications of the tanks and <br /> their supports in this report are based on available structural <br /> information; structural analyses; and visual inspections, before <br /> and after modifications, of the tanks and their supports without <br /> any material testing. <br /> We do not if the existing anchor bolts, reinforcing steel and <br /> foundation, etc. have been constructed in accordance with the <br /> construction documents. In addition, the information of polyolefin <br /> tanks is limited due to the proprietary rights of the tank <br /> supplier. The findings and the recommended modifications of the <br /> tanks and their supports in this report are also based on our <br /> engineering judgement. They are made for the present environment <br /> of the facility. Therefore, they should be revised when the <br /> surrounding environment in the facility changes. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.