Laserfiche WebLink
rraparaerr or 1"fC WJDZT nat8 CanCral febe ry 22 1994 <br /> Table *: Closure Cost Estimate (cVfitinued) <br /> Description Quantity (ie. Cost/ Total <br /> gallon, Quantity Cost <br /> pounds, unit) <br /> D. Transportation Costs: <br /> Wastes from Containers <br /> Wastes from Tanks <br /> Tanks and Containers <br /> structure/Buildings/Equipment <br /> GAO <br /> E. Sampling Costs (includes quality control samples) <br /> Containers <br /> Tank: <br /> Ancillary Equipment <br /> Structures/Buildings <br /> soil <br /> Washwater/Residue Generated from <br /> Closure Activities <br /> SUBTOTAL: I <br /> F. Closure Certification Costs <br /> Preparation of Certification (clerical) <br /> Preparation of Certification by P.E. <br /> Inspection by Certified P.E. <br /> Review by Certified P.E. <br /> SUBTOTAL: 'Zcz-o <br /> CLOSURE SUBTOTAI: of Parts A, B, C, D, E, and F: L13.�5co <br /> Contingency Factor Of 20$ of CLOSURE SUBTOTAL: S �C-c <br /> TOTAL (CLOSURE SUBTOTAL and Contingency Factors 5 'Z2CC`. <br /> 82 <br />