My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1994 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1443
>
2231-2238 – Tiered Permitting Program
>
PR0507023
>
COMPLIANCE INFO_1994 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 12:24:44 PM
Creation date
7/30/2020 7:45:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994 - 2018
RECORD_ID
PR0507023
PE
2232
FACILITY_ID
FA0001542
FACILITY_NAME
VIKTRON EXPRESS
STREET_NUMBER
1443
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16330017
CURRENT_STATUS
02
SITE_LOCATION
1443 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\N\NAVY\1443\PR0507023\COMPLIANCE INFO 1994 - 2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Conformation Sampling For Structures and Equipment and Analytical Test Methods <br /> All process tanks will be sampled using wipe sampling to obtain the sample. An area of approximately 1 square foot <br /> will be sampled. <br /> The floor area in the waste treatment area will be sampled using chip sampling to obtain the sample material. A <br /> grid will be established with 10 feet between points on the grid. This will include sample points in the trenches and the <br /> sump. <br /> All samples will be analyzed for Copper,Lead, and Nickel. The analysis will be performed at a state certified <br /> laboratory. The samples will be analyzed using EPA method 6010 or other appropriate method as recommended. <br /> E. Closure Cost Estimate <br /> Closure Cost Estimate <br /> Description Quantity Cost/ Total <br /> Lbs uantity Cost <br /> A. Costs for Removal/DisposaVTreatment of: <br /> Waste in Containers Treated on Site 72,050 $0.10 $7,205 <br /> Waste in Tanks Treated On Site 534,500 $0.01 $ 5,345. <br /> Waste in Containers Removed from Site 5,500 $0.50 $2,750 <br /> Waste in Tanks Removed from Site 30,000 $0.13 $3,900 <br /> Wash Water Generated from Closure Activities 563,000 $0.01 $ 5.630 <br /> Solder-Dross 2,000 -$0.50 -$ 1,000 <br /> Waste Water Treatment Sludge 36,000 $0.13 $4,680 <br /> Contaminated Debris 40,000 $0.27 $ 10,800 <br /> Containers 131 -S 1.00 -S 131 <br /> Subtotal: $ 39,179 <br /> B. Transportation Costs: <br /> Waste from Tanks $2,000 <br /> Waste Water Sludge $2,100 <br /> Subtotal: $4,100 <br /> C. Sampling Costs <br /> Tanks 25 $ 150 $ 3,750 <br /> Structures 80 $ 150 $ 12,000 <br /> Subtotal: $ 15,750 <br /> D. Closure Certification Costs <br /> Preparation, Inspection, and Review by P.E. $ 10,000 <br /> Subtotal: $ 10,000 <br /> Closure Subtotal of parts A, B, C, and D. $69,029 <br /> Contingency Factor of 20%of Closure Subtotal: $ 13,806 <br /> Total (Closure Subtotal and Contingency Factor): $ 82,835 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.