D. Conformation Sampling For Structures and Equipment and Analytical Test Methods <br /> All process tanks will be sampled using wipe sampling to obtain the sample. An area of approximately 1 square foot <br /> will be sampled. <br /> The floor area in the waste treatment area will be sampled using chip sampling to obtain the sample material. A <br /> grid will be established with 10 feet between points on the grid. This will include sample points in the trenches and the <br /> sump. <br /> All samples will be analyzed for Copper,Lead, and Nickel. The analysis will be performed at a state certified <br /> laboratory. The samples will be analyzed using EPA method 6010 or other appropriate method as recommended. <br /> E. Closure Cost Estimate <br /> Closure Cost Estimate <br /> Description Quantity Cost/ Total <br /> Lbs uantity Cost <br /> A. Costs for Removal/DisposaVTreatment of: <br /> Waste in Containers Treated on Site 72,050 $0.10 $7,205 <br /> Waste in Tanks Treated On Site 534,500 $0.01 $ 5,345. <br /> Waste in Containers Removed from Site 5,500 $0.50 $2,750 <br /> Waste in Tanks Removed from Site 30,000 $0.13 $3,900 <br /> Wash Water Generated from Closure Activities 563,000 $0.01 $ 5.630 <br /> Solder-Dross 2,000 -$0.50 -$ 1,000 <br /> Waste Water Treatment Sludge 36,000 $0.13 $4,680 <br /> Contaminated Debris 40,000 $0.27 $ 10,800 <br /> Containers 131 -S 1.00 -S 131 <br /> Subtotal: $ 39,179 <br /> B. Transportation Costs: <br /> Waste from Tanks $2,000 <br /> Waste Water Sludge $2,100 <br /> Subtotal: $4,100 <br /> C. Sampling Costs <br /> Tanks 25 $ 150 $ 3,750 <br /> Structures 80 $ 150 $ 12,000 <br /> Subtotal: $ 15,750 <br /> D. Closure Certification Costs <br /> Preparation, Inspection, and Review by P.E. $ 10,000 <br /> Subtotal: $ 10,000 <br /> Closure Subtotal of parts A, B, C, and D. $69,029 <br /> Contingency Factor of 20%of Closure Subtotal: $ 13,806 <br /> Total (Closure Subtotal and Contingency Factor): $ 82,835 <br /> 2 <br />