My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
2231-2238 – Tiered Permitting Program
>
PR0506887
>
COMPLIANCE INFO_PRE-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2020 10:29:33 AM
Creation date
7/30/2020 7:46:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE-2016
RECORD_ID
PR0506887
PE
2233
FACILITY_ID
FA0006674
FACILITY_NAME
OWENS-BROCKWAY GLASS CONTAINER INC
STREET_NUMBER
14700
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209-240-24
CURRENT_STATUS
02
SITE_LOCATION
14700 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\S\SCHULTE\14700\PR0506887\COMPLIANCE INFO PRE-2016.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM ORDER NO. 5-00-056 -2- <br /> OWENS-BROCKWAY AND <br /> OWENS-ILLINOIS GLASS FURNACE FACILITY <br /> SAN JOAQUIN COUNTY <br /> Parameter Units Type of Measurement Inspection Frequency <br /> Sludge depth and scum thickness Feet Staff Gauge Quarterly <br /> in each compartment of each septic tank. <br /> Distance between bottom of scum Inches Staff gauge Quarterly <br /> layer and bottom of outlet device. <br /> Distance between top of sludge layer Inches Staff gauge Quarterly <br /> and bottom of outlet device. <br /> Septic tanks shall be pumped when any one of the following conditions exist or may occur before the <br /> next inspection: <br /> a. The combined thickness of sludge and scum exceeds one-third of the tank depth of the first <br /> compartment: or, <br /> b. The scum layer is within three inches of the outlet device; or, <br /> c. The sludge layer is within eight inches of the outlet device. <br /> In lieu of septic tank measuring, the septic tanks may be pumped quarterly. <br /> LEACHFIELD MONITORING <br /> Both domestic wastewater systems will be visually monitored. Leachfield monitoring will consist of <br /> visual inspection of the leachfield and nearby area. The leachfield and the area downslope of the <br /> leachfield shall be inspected on a monthly basis for the presence of vvet areas, leachate or groundwater <br /> seepage, objectionable odors, and/or unexpected plant growth. Leachfield monitoring results shall be <br /> included with all monthly monitoring reports. <br /> PROCESS WASTEWATER EVAPORATION/PERCOLATION PONDS <br /> Samples shall be collected from an established sampling station located in an area which will provide a <br /> sample representative of the wastewater in Pond No. 3, or the furthest downstream treatment pond in <br /> active use. Freeboard monitoring shall be performed at all ponds. Freeboard will be measured <br /> vertically from the surface of the pond water to the lowest elevation of the surrounding berm. Process <br /> wastewater pond monitoring shall include at least the following: <br /> Sample Sampling Reporting <br /> Constituent Units Type Frequency Frequency <br /> Dissolved Oxygen mg/1 Grab Monthly Monthly <br /> Flow Gallons Metered Continuous Monthly <br /> Freeboard Feet Measurement Monthly Monthly <br />
The URL can be used to link to this page
Your browser does not support the video tag.