My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
1313
>
2231-2238 – Tiered Permitting Program
>
PR0527699
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 5:17:14 PM
Creation date
7/30/2020 7:46:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527699
PE
2231
FACILITY_ID
FA0006195
FACILITY_NAME
Mepco Label Systems
STREET_NUMBER
1313
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
St
City
Lodi
Zip
95240
APN
04705013
CURRENT_STATUS
02
SITE_LOCATION
1313 S Stockton St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\S\STOCKTON\1313\PR0527699\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE:TThule Towing Systems Page 3 of 5 <br /> server:2202463:TPP1otPlanThule_5-08.pdE <br /> Hello Aris, <br /> I just left a message on your voicemail ... <br /> We spoke in early June and you were going to discuss the <br /> project with your supervisor and I was going to get you a <br /> more thorough description of the process (below) and a <br /> drawing(attached). <br /> Please give me a call and let's discuss at your earliest <br /> convenience. <br /> I am usually in from 8:30 am to 3:00 pm ... I expect that is <br /> exactly when you are OUT -but I hope we can connect. I <br /> will stay later than 3:00 if I know we can talk. <br /> Waste generating process: <br /> Our rinse stations in our washer area of the paint line are <br /> Stages (tanks) 2, 4, S and 7; each rinse tank was tested <br /> separately. There are a total of 8 stages in the paint line and <br /> are asfollows: <br /> Stage 1 is Potassium hydroxide for cleaning the oils and dirt <br /> off of the parts; it is a spray wash heated to 170 degrees and <br /> is changed out 3 to 4 times per year. It is pumped into totes <br /> than hauled offsite by Advanced Chemical Treatment. <br /> Stage 2 pre rinse 1 and post rinse 2 is a rinse tank filled with <br /> City-supplied water; the pre rinse and post rinse are spray <br /> washes that are supplied by the stage 2 spray wash pump and <br /> drain back into the tank. We change this tank out on a weekly <br /> basis and refill with City water. <br /> Stage 3 is a Citric Acid spray wash for removing scale and <br /> carbon from the parts; it is heated to 170 degrees and is <br /> changed out on a monthly basis,pumped into totes and <br /> hauled offsite by Advanced Chemical Treatment. <br /> Stage 4 pre rinse 1 and post rinse 2 is a rinse tank filled with <br /> City water that is a spray wash like stage 2 tank; it is drained <br /> and refilled on a weekly basis. <br /> 9/8/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.