My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EMBARCADERO
>
6649
>
2300 - Underground Storage Tank Program
>
PR0231098
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 9:48:28 AM
Creation date
7/31/2020 11:56:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231098
PE
2361
FACILITY_ID
FA0003830
FACILITY_NAME
VILLAGE WEST MARINA
STREET_NUMBER
6649
STREET_NAME
EMBARCADERO
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09815006
CURRENT_STATUS
01
SITE_LOCATION
6649 EMBARCADERO DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> Recommended Practices for the Testing and Verification of Spill, Overfill, leak Detection and Secondary Containment Equipment at UST Facilities <br /> NOTE: If the fill cap. is not included in the the spill bucket. The vacuum level is monitored for <br /> spill bucket test and/or the cap is not tight, it ff <br /> a 1 -minute period . <br /> could be the source of potential fuel contami- .3 .3 Test Equipment . Test equipment shall <br /> nation from water intrusion, anc de: <br /> U <br /> um. test apparatus (The test apparatus may <br /> NOTE: Before permanently plugging, avlable from the spill bucket manufacturer, <br /> that local regulations allow the drain valve to <br /> 10 � <br /> 0 ,�r It in air pressure regulator, a vacuum <br /> be permanently plugged . <br /> _. . _ . . ..._... .: _ . . . .. . . . ... . . . _ , .. . . : ` rce, gauge with a minimum 0-50 <br /> ' V <br /> in water I n range and a control valve . <br /> 6 .2 .5 Test Procedure . ys; <br /> r The control valveis used to adjust the vacuum <br /> 1. Add water to the spill bucket to a level within <br /> ° 1 vel. ) ; <br /> 1 .5 inches of the top of the spill bucket. Allow ° tesover (The cover is equipped with a test fit- <br /> the water to settle for 5 minutes before the initial ting, ) ; <br /> water level measurement is taken. <br /> plumber 's plug (appropriate size, if used) , <br /> 2 . Place the measuring stick vertically at the lowest <br /> point in the spill bucket and extending above the stopwatch or other time-measurement device <br /> water level to allow for an accurate measure- capable of measuring a 1 -second increment; <br /> ment to be taken. The location of the measuring ° gasketing material (The purpose of the gas- <br /> stick must remain the same for each water level keting material is to provide an air-tight seal <br /> measurement. Document the initial water level between the test cover and the spill bucket.) . <br /> measurement as measured from the bottom of <br /> the spill bucket. Alternative measurement meth- 0 500 water Column <br /> ods may be used provided that measurement to Vacuum Vacuum Gauge <br /> 1/ 16 (0.063) inch can be made. source <br /> 3 . Take all precautions to prevent the water level <br /> from being disturbed during the duration of the control <br /> j test. Valve <br /> 4. After 1 hour, document the ending water level <br /> measurement. <br /> S. Upon completion of the test, remove and dis- <br /> pose of the water according to Section 6.7 , and <br /> dry the inside of the spill bucket before returning Plumber's Plug in <br /> it to service. Tank Riser Pipe <br /> 6 .2.6 Pass/Fail Criteria . If the water level has <br /> j dropped less than 1 /8 (0. 125) inch, the spill bucket <br /> passes the integrity test. <br /> i <br /> If the water level has dropped 1/8 (0 . 125) inch or <br /> greater, the spill bucket fails the integrity test. <br /> 6 . Spill Bucket Integrity Testing --- Vacuum Test FIGURE ,6.2. The cover must make a tight seal with the <br /> M thod . spill bucket to prevent leakage when the vacuum is <br /> 6 .3.1 Purpose . This method is used to test the pulled during the test. <br /> integrity of single-walled spill buckets or the pri- <br /> mary containment of secondarily contained spill W/1i�3VA15L(! : Use only an air-operated vac- <br /> buckets , uum source or a vacuum pump pow- <br /> ; 6.3 .2 Description of Test . Using a specially eyed by an explosion-proof motor. Vacuum <br /> equipped test cover, a partial vacuum is applied to pumps with electric motors that are not <br /> pei .org <br />
The URL can be used to link to this page
Your browser does not support the video tag.