Laserfiche WebLink
SEEMS <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment,• 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> -- --- -- -- -r - - - --- -_ _ . __ -- -- - - ____ ___ . - - - --- ----- - -_ _ _ __ _ _ ___ ___ _ . _f - - - - - -- - - - - ----- - ---- -- -- - - - - - - -- - <br /> s <br /> iSheAddress: PARICWOODVALERO 1612R . HAAmEERLANE STOCKTONCA 95210 <br /> *PIPING <br /> (ARROWS) <br /> Dra\vingOfpipit7g <br /> exit of sump and <br /> UDC's. Ko - FLOATS 8 CHAINS IN DI SP, . - . . . . . . . <br /> underground _ 2 - . - . _ . . .. .d _ - . _ . . . - _ - . . . . . . . <br /> dratving is <br /> . 3C.patAl2„ e . . . 3. <br /> w <br /> cannot speculate <br /> blue prints. <br /> . a a <br /> 5, <br /> o <br /> - <br /> . T. <br /> T <br /> S 8_ <br /> . . . KEY. _ . . . . <br /> A = ANN[JI R <br /> F = FILLS a <br /> T = TURBINE . . . . . . <br /> P = PROBE 3 <br /> V = VAPOR � <br /> X = SIAEP SENSOR . . . . _ . . <br /> L = Leak Detector - _ _ - - * DIE . . . . . _ . . _ <br /> 111 = kfamvay <br /> B = Brine Sensor <br /> I = Smart Sensor . . . . <br /> S = STP <br /> C = Floats fi Chains Irp' item: «ra$rg7 oror( tlrm R1'e 17Gf \75t11e to r1Y ( e17(ttlttrP tECI7«I11 are d <br /> E = E Stop prdes.iam apiraonor nrzlrre sdefi fce i7�oronliorr71r7p� at . Drrnring <br /> rot to scde <br /> Date map was drawn[ 618118 <br /> Instructions <br /> If you already have a diagram that shows all required informatiom you may include_ it, rather than this page, with your Rlonitoring System Certification. On your site plan , <br /> show the general layout of tanks and piping. Clearly dentify Iocatnons of the following equcpment. ifinstalled: monitoring system control panels: sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas, ,mechanical or electronic line leak detectors; and in-tank [quid level <br /> probes (if used for leak detection). In the space provided, note the data this Sae Plan was prepared. <br /> Monitoring System Certification Paged ofd 21'2V07 <br /> LEGEND <br />