Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection ❑x 36 Month Inspection <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10181241 9/ 19/2018 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> PARKWOOD SHELL <br /> Business Site Address city ZIP Code <br /> 1612 W Hammer Lane Stockton 95209 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification.) Phone # <br /> Zane Nimmo (209 ) 744 - 0112 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 04- 1676 Ex . 03/31 /2019 8883064- UT 6/ 1 /2019 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> FF- EBW , PhikTite & EVR Phase 1 10009843708 Ex 11 -29 -20 OPW 104-632 Ex 3- 14-2020 <br /> Emco 3206 Ex . 11 / 14/2020 ATG : VR : A28446 Ex . 9/28/ 19 Incon # 1009843708 Ex . 11 -30-20 <br /> III . OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method ❑x Manufacturer Guidelines (Specify) : OPW <br /> Used : <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify) : <br /> Attach the inspection procedures and all documentation required to determine the results. # of Attached Pages 5 <br /> TANK ID : (By tank number, storedproduct, etc.) 1 - DIESEL 87 91 <br /> What is the tank inside diameter? (Inches) 96 96 96 <br /> Is the fill piping secondarily contained ? ❑ Yes ❑x No ❑ Yes ❑x No ❑ Yes ❑x No ❑ Yes E No <br /> Is the vent piping secondarily contained ? ❑ Yes [j] No ❑ Yes N No ❑ Yes M No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) VEEDER ROOT <br /> What is the overfill prevention equipment response ❑x Shuts Off Flow ❑x Shuts Off Flow ❑x Shuts Off Flow ❑ Shuts Off Flow <br /> when activated ? <br /> ❑ <br /> (Check all that apply.) Restricts Flow ❑ Restricts Flow El Restricts Flow El Restricts Flow <br /> E A/V Alarm E A/V Alarm ❑ AIV Alarm ❑ A/V Alarm <br /> Are flow restrictors installed on vent piping ? ❑ Yes ❑x No ❑ Yes ❑X No ❑ Yes 0 No ❑ Yes ❑ No <br /> At what level in the tank is the overfill prevention set <br /> to activate? (Inches from bottom of tank.) 97 86 86 . 25 <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 101 94 % 95 % <br /> Is the overfill prevention in proper operating condition ❑ Yes ❑x Yes ❑x Yes ❑ Yes <br /> to respond when the substance reaches the <br /> appropriate level ? ❑x No (Specify in V. ❑ No (Specify in V.) ❑ No (Specify in V) ❑ No (Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ❑ Pass MT il 0 Pass ❑ Fail ❑x Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS In 7 1 , <br /> Any items marked "Fail" must be explained in this section . Any additional comments may also be ided here. <br /> MAII 2 5 2019 <br /> Vi . CERTIFICATION BY UST SERVICE TECHNICIAN CON DUCTIN r.IN4, R ( TIQN\ HEALT�-} <br /> I hereby certify that the overfill prevention equipment was inspected in accordance with California Co g1:of-Regulatipnsjitle 23, <br /> Division 3 , Chapter 16 , Section 2637 . 2 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council, AA/ = Audible and Visual <br />