Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page s of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment, 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Stehddress:__ Quick N Easy Mart 2057 S . EI Dorado Street StockEtin CA <br /> . _ . <br /> KEY <br /> . . . . . . A I A A A = AITNIMAR <br /> . . . . . . . . . . . . . . . . . . <br /> F = FILLS <br /> T = TURBINE <br /> P = PROBE <br /> s V = VAPOR <br /> X = SUMP SENSOR <br /> L = Leak Detector <br /> Ill = Manley* <br /> B = Brine 5tnsor <br /> . . . I = smart SeaSor <br /> ATG S = STP <br /> ❑ E-Stop . . . . . C = Floats & chaiva <br /> p E _ £ Stop <br /> t. t. <br /> C C _ . <br /> 1 . 2w . . .5 - 6. _ . . . . . . 87 91 <br /> 3. 4. w1 _ 7. .8 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> *PIPDZG s <br /> (ARROWS) <br /> Drawing of piping <br /> exit of sump and <br /> UDC's. Ko <br /> . . . . . _ _ _ underground <br /> drawing is K&Ww <br /> n4e cannot <br /> . . . . . . It El Dorado St speculate blue <br /> . _ q prints. <br /> A?W item undegrourd diat ars riot visible to the certl6*W techniciat are a <br /> prrtfessional opbdon on&v aid me sole(v for btformotional pmposrs. Drawbig <br /> not to Coale <br /> Date map was drawn: 217118 <br /> Instructions <br /> If you alreadyhave a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan , <br /> shave the general layout of tanks and piping. Clearly identity locatoas- of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; andiin-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared <br /> LEGEND <br />