Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SPILL CONTAINER TESTING REPORT FORM ( Page 1 of 1 ) <br /> Type of Action ❑ Installation Test ❑ Repair Test M 12 Month Test <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test <br /> 10182111 2/ 13/2019 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> ELDORADO FOOD MART <br /> Business Site Address <br /> F <br /> ity ZIP Code <br /> 2320 N . EL DORADO STREET TOCKTON , CA 95204 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification) Phone # <br /> ZANE NIMMO ( 209 ) 744 - 0112 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 04- 1676 Ex . 3/31 / 19 8883064 - UT 6/ 1 /2019 <br /> Spill Container Testing Training and Certifications (List applicable certifications.) <br /> Franklin Fueling - EBW & Phil Tite # 10009843708 Ex . 11 /29/2020 <br /> OPW # 104-632 Ex . 3/ 14/2020 <br /> III . SPILL CONTAINER TESTING INFORMATION <br /> Test Method Used : ❑x Manufacturer Guidelines (Specify) : O P W <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify) : <br /> Attach the testing procedures and all documentation required to determine the results. # of Attached Pages <br /> TANK ID : (By tank number, storedproduct, etc) 1 - 91 OCT 2 - 87 OCT 3 - DIESEL <br /> Spill Container Manufacturer: O P W O P W O P W <br /> Method of Cathodic Protection: ❑x Non- Metallic N Non-Metallic N Non-Metallic ❑ Non-Metallic <br /> ❑ Isolation ❑ Isolation ❑ Isolation ❑ Isolation <br /> ❑ Other (Specify in V) ❑ Other (Specify in V.) ❑ Other (Specify in V.) ❑ Other (Specify in V) <br /> Inside Diameter of Spill Container: (Inches) 11 11 11 <br /> Depth of Spill Container: (Inches) 14 13 3/4 12 1 /2 <br /> Does the spill container have a 5 gallon capacity? ❑x Yes ❑ No ❑X Yes ❑ No N Yes ❑ No ❑ Yes ❑ No <br /> Method to Keep Spill Container Empty: ❑x Drain Valve N Drain Valve ❑x Drain Valve ❑ Drain Valve <br /> ❑ Onsite Pump ❑ Onsite Pump ❑ Onsite Pump ❑ Onsite Pump <br /> ❑ Other (Specify in V) ❑ Other (Specify in V.) ❑ Other (Specify in V.) ❑ Other (Specify in V.) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results : ❑Q Pass P_EaiIjj N Pass ❑ Fail ❑Q Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> Any items marked "Fail" above must be explained in this section. Any additional comments may also be provided here. <br /> YAY `.%' 4 2019 <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN 'C MI OUC G THI $' TESTINGi i <br /> 1 hereby certify that the spill containers were tested in accordance with California Code of ' RegU ations , Title 23 , Division 3 , <br /> Chapter 16 , Section 2637 . 1 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> i <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council <br />