Laserfiche WebLink
C) PEURP1200 - 17 <br /> 7 . 1. 3 Description of Inspection . After a pre- <br /> 7 . UST OVERFILL liminary inspection of the automatic shutoff instal- <br /> EQUIPMENT lation , the drop tube is removed from the tank. The <br /> VERIFICATION , and <br /> shutoff is checked for proper operation, <br /> and its placement is measured to verifythat it is <br /> INSPECTION AND properly located to completely shut off flow when <br /> TESTING the tank is no more than 95 percent full . <br /> 7 . 1. 4 Preparation . Refer to the tank manufac- <br /> Although the effectiveness of overfill prevention devices turer ' s calibration chart for the capacity in gal- <br /> can be tested by attempting to overfill an underground Ions , the diameter and the volume of product with <br /> storage tank (UST) with product and determining how well respect to product level . <br /> the device functions , this approach is not recommended. If the automatic shutoff device has a float that <br /> Any malfunction in the overfill prevention device could extends from the drop tube in the shutoff (closed) <br /> result in a product release that could result in a threat to position, verify the proper orientation of the float <br /> public health and safety and environmental damage . mechanism . The float mechanism should be orient- <br /> Federal UST rules require that overfill prevention ed away from any obstructions (ball float, submers- <br /> equipment automatically restrict flow or alert the transfer ible turbine pump [STP] , tank wall , tank gauge <br /> operator when the tank is no more than 90 percent full probe, etc . ) If the movement of the float mecha- <br /> or shut off flow into a tank when it is no more than nism is restricted, it will not function as designed. <br /> 95 percent full . Other alternatives to prevent overfills <br /> Use this procedure in conjunction with the manu- <br /> are the restriction of flow during a delivery 30 minutes facturer ' s installation and maintenance instruc- <br /> prior to overfilling ; alerting the operator 1 minute before <br /> tions . <br /> overfilling may occur ; or automatically shutting off flow <br /> into a tank so that none of the fittings located on top of 7 . 1. 5 Inspection Equipment . Test equipment <br /> the tank are exposed to product due to overfilling. shall include : <br /> The PEI Overfill , Release Detection and Release tools for removal of the drop tube ; <br /> Prevention Equipment Testing Committee has written <br /> the recommended practices for automatic shutoff devices tape measure ; <br /> to reflect that the devices must be set to shut off flow tools for inspection of the automatic shutoff. <br /> when the tank is no more than 95 percent full , and flow <br /> restriction and overfill alarm devices must automatically 7 . 1. 6 Inspection Procedure. <br /> restrict flow or alert the transfer operator when the tank 1. Remove the drop tube from the tank. <br /> is no more than 90 percent full . This approach reflects the 2 . Visually inspect the automatic shut off valve and <br /> more conservative application of the rules . float mechanism for any damage or corrosion <br /> 7 . 1 Automatic Shutoff Devices . that inhibits the functionality of the device , and <br /> remove any debris and foreign objects . <br /> j 7 . 1. 1 General . Automatic shutoff devices , <br /> 3 . Manually move the float mechanism to ensure it <br /> sometimes called flappers or flapper valves , are <br /> an integral part of the drop tube assembly installed <br /> moves freely. <br /> within the tank fill riser. They are designed to 4. With the float mechanism in the shutoff (closed) <br />` initially restrict and subsequently completely shut position, visually inspect the drop tube and <br /> off flow when product has reached predetermined verify that the shutoff valve is released and will <br /> levels during a delivery. Automatic shutoff valves move into the product flow path, <br /> need to be properly positioned and operate freely to <br /> 5. If possible, verify that the bypass valve in the <br /> control flow and prevent tank overfills . <br /> drop tube is open and free of blockage. <br /> 7 . 1. 2 Purpose . The purpose of this inspection 6 . If problems with the shutoff valve are found and <br /> is to verify the automatic shutoff valve is installed defective components need repair or replace- <br /> properly, operates as designed and is set to com- ment, notify the appropriate person . <br /> pletely shut off flow when the tank is no more than <br /> 95 percent full . <br /> i pei. org <br />