My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1515
>
2300 - Underground Storage Tank Program
>
PR0545645
>
INSTALL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:44:03 AM
Creation date
8/3/2020 12:07:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2020
RECORD_ID
PR0545645
PE
2351
FACILITY_ID
FA0025876
FACILITY_NAME
7 ELEVEN INC #38877
STREET_NUMBER
1515
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15904026
CURRENT_STATUS
01
SITE_LOCATION
1515 E MAIN ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® KEY NOTES <br /> 1� CONCRETE SLAB, REF CIVIL DRAWINGS FOR TOS <br /> EXPLOSIVE PROOF J-BOX <br /> WITH 314" NPT THREADS ELEVATIONS. ALL MANHOLES WITHIN THETA <br /> NK <br /> SLAB AREA TO BE RAISED 1"ABOVE THE NORMAL <br /> MOUNT FLAT. GC TO INSTALL <br /> IN UPRIGHT POSITION GRADE OF CONCRETE, SLOPE CONCRETE T <br /> MANHOLES 114PER FT." CROWN CONCRETE AS TO o <br /> CORD AND CORD GRIP NOT INHIBIT WATER DRAINAGE OFF THE TANKCL <br /> SUPPLIED WITH PROBE SLAB (NO POOLING). 8 <br /> C <br /> g 0 GEOTECH FABRIC MATERIAL,TO EXTEND 60" 0 <br /> MINIMUM PAST THE TANK HOLE EXCAVATION. ALL <br /> 8"CONCRETE SLAB GEOTECH FABRIC MATERIAL SHALL BE PINNED <br /> PRIOR TO BACKFILLING. METHOD OF PINNING <br /> FABRIC AT TOP OF EXCAVATION TO BE APP <br /> 4 e <br /> a e 4 a= , BY THE 7-ELEVEN CONSTRUCTION MGR- <br /> -Mir <br /> MOH STRAP ANCHOR SYSTEM SUPPLIED BY TANK ❑ <br /> PEA GRAVEL BACKFILL TYP <br /> (OR APPROVED MANUFACTURER. PLACE DEADMEN <br /> PER <br /> MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br /> ALTERNATE) <br /> ® FOR SLOPE, FOLLOW CURRENT OSHA N <br /> REGULATIONS. IF SHEET PILES ARE UTILIZED, <br /> PROVIDE 42"MINIMUM CLEARANCE BETWEEN NEW Proto 11-05-18 <br /> TANKS AND SHORING. <br /> CONDUIT WITH SEAL-OFF <br /> TYP REF 1-G9.0 AND 1-G12.0 <br /> BURIAL DEPTH GREATER THAN 5'-$"REQUIRES <br /> 7-ELEVEN AND MANUFACTURER'S APPROVAL. <br /> 01 4" FRP RISER PIPE ® UNDISTURBED SOIL OR COMPACTED BACK FILL <br /> NOT LESS THAN 85% OF MODIFIED PROCTOR <br /> BRINE LIQUID LEVEL <br /> 31 BELL BY MALE FITTING AT DENSITY(AASHTO-T-18D). <br /> EACH END OF PIPE RISER <br /> 9 STP/ATG MANHOLES ~ <br /> 5-0„ REF 1-G4.0&2-G4.01 <br /> 2U�r <br /> O Cf) <br /> BRINE TANK RESEVOiR MIN Z ? M � � Z <br /> .t. • .• . :r• ; ti. .�.:..Vii•` <e.y _ � � � O <br /> W © Z ° z w <br /> u <br /> TANK RIB —L6 W 3: � � <br /> W w z U z <br /> INTERSTITIAL SPACE <br /> FILLED WITH BRINE W w ©U <br /> W ~ <br /> INNER TANK WALL 01 ~ m W <br /> U �- <br /> 1 1 <br /> O <br /> O <br /> N <br /> TANKS#1,#2, 4 <br /> AND#3 <br /> PEA GRAVEL BACKFILL TYP <br /> LL (OR APPROVED ALTERNATE) <br /> 12"PEA GRAVEL BACKFILL <br /> MATERIAL(OR APPROVED <br /> ALTERNATE) UNDER TANKS <br /> AND DEADMEN <br /> 3 <br /> 24" 24" 24" 24" 24" 24" <br /> MIN MIN MIN MIN MIN MIN N 0 T USED- <br /> 10 ' <br /> SED <br /> ANNULAR SPACE2 <br /> 10 DIA UNDERGROUND STORAGE TANK SECTION- <br /> RISER AND SENSOR SECTION- 3 1/4"=V—Opt <br /> 4 1/2"=V-0" z 'l,O ' <br /> 20 <br /> 7IL <br /> vi <br /> N <br /> We <br /> g w n <br /> E <br /> w ¢ 3 <br /> U, ❑ <br /> PRODUCT FILL AND OFFSET ANNULAR SPACE ""� & <br /> MANHOLE TO MAINTAIN 10" J <br /> VENT MANHOLE CLEARANCE FROM STP COVER 7 <br /> REF 2-G4.1 ❑ <br /> _ <� <br /> BiSTPIATG MANHOLE ANNULAR SPACE <br /> Bi STPIATG MANHOLE REF 2-G4.0 RISER REF 4-G3.0 � U <br /> STP/ATG MANHOLE PRODUCT FILL AND ANNULAR SPACE PRODUCT FILL AND <br /> REF 1-G4E O VAPOR MANHOLE RISER <br /> VAPOR MANHOLE REF 1-G4.0 0 5'-0" � <br /> 1 0 REF 1-G4.1 REF 4-G3.0 (PUL REF 1-G4.1 (DSL � M0" MIN � a <br /> RUL <br /> 5 2 APOR)(FILL} FILL) APOR) FELL) Y - <br /> 00 <br /> • , u } .. .... .: "••-r . '...' _,.. ,,.f. `..� :4:., J <br /> C14 <br /> OO z <br /> Z <br /> -71 <br /> 01 m <br /> v <br /> J1. J1 PEA GRAVEL BACKFILL TYP N <br /> OR APPROVED ALTERNATE) }' <br /> I <br /> ( (a (� f. c_I O U <br /> PUL <br /> DIESELNK#3 N <br /> 12"PEA GRAVEL BACKFILL ami o e m p c a <br /> RUL TANK#2 TA MATERIAL(OR APPROVED 4) U m `� m `� - nN <br /> TANK#1 cp�, � � p <br /> ALTERNATE) UNDER 8 o E 2 c <br /> TANKS AND DEADMEN o Qs o o N <br /> L2. 3� cc:T <br /> f� p C 4'6-.0. C U1 C_T©W <br /> E <br /> � pa80E <br /> t� LLA �Ri <br /> auc 4? Q.C L1-^ pN� ui— N <br /> i p <br /> pyAd} N � N � rnpN <br /> o • <br /> N 3 ❑ I c �us0LON � E <br /> ❑ p c � ��` C� p <br /> 1 7 4' 63„ 4"_11„ 2'-g„ 4'- �� 5 4" 1'-42' 4'-11-2" 5`-1 s, c <br /> 4�_��� 6' 10-„ 4' 1�" 6' 8„ 5'_8„ 4-12' S'-108„ 8 5-6" 2 <br /> ' pFESSI, ✓` <br /> 18141 189_0" <br /> 18'-0" <br /> 37'-9 3'-22" cam/ <br /> 37'-4" 3' 0" 4 �' 35558 <br /> 78'-6" 9�FCHAN�GP <br /> OF C <br /> 12/18/19 <br /> ' GALLON TANK SECTION- <br /> 11/43'=V-019 <br /> SH10 DIA2D000 G3 . 0 <br /> FUELING - USA CA <br /> �CD <br /> aA <br />
The URL can be used to link to this page
Your browser does not support the video tag.