Laserfiche WebLink
NOTE: <br /> s FOR REINFORCING AT TANK GENERAL NOTE S <br /> SLAB PENETRATIONS AND 92'-0" O.T.O. TANK SLAB <br /> CORNERS REF 6-G6.1 90'-3" <br /> (MIN BOUNDARY TOP OF EXCAVATION) <br /> 86'-3" <br /> (MIN BOUNDARY BTM OF EXCAVATION) 1 ALL CONSTRUCTION SHALL MEET COUNTY <br /> STANDARDS. CONTRACTOR TO SECURE ENTIRE <br /> CONSTRUCTION AREA WITH CHAIN LINK <br /> z - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - � - - - - - - - - FENCING DURING CONSTRUCTION PERIOD. � H <br /> O O - - - - - - - - - - - - - - � I •Z Z Z Z <br /> - - - - - - - - - - <br /> Q Q r c) I 2 THE CONTRACTOR SHALL IMMEDIATELY NOTIFY W W W <br /> > > I I m ENGINEER OF ANY DIFFERENCES BETWEEN THE <br /> Q a I 61 B1 I Q <br /> X X I I ACTUAL FIELD CONDITIONS AND THE PLANS 0 0 0 <br /> w w I I I I z BEFORE PROCEEDING WITH CONSTRUCTION. U U U <br /> 0 0 I Q } } } <br /> ° �° <br /> _ O : O O � 3 FUEL CONTRACTOR SHALL BE RESPONSIBLE ~ ~ ~ <br /> °'Oo r'm I I ° ° I I O FOR THE INTEGRITY OF THE PIPING SYSTEM U U U <br /> D D <br /> DURING CANOPY ERECTION AND CONCRETE o 0 0 <br /> 0 o I I i I o FLATWORK INSTALLATION. r <br /> o O N <br /> N 4 AFTER COMPLETING INSTALLATION OF o 0 0 <br /> 1-G3.0 - - - <br /> z <br /> m m I L _ _ _ _ _ _ _ _ _ _ _ _ � DISPENSERS, THE FUEL CONTRACTOR IS TO � <br /> z I INSTALL BRIGHT ORANGE CONSTRUCTION <br /> - - - FENCE AROUND ENTIRE DISPENSER. = N <br /> 5 FUEL CONTRACTOR IS TO BE AWARE THAT ON <br /> co THE DAY THE GASOLINE SYSTEM IS PUT INTO Proto 11-05-18 <br /> L40 20 19 RUL 26 L42 L18 L43 PUL 2 20 19 41 L56 DSL 28 20 19 L72 L18 O -j <br /> z Un SERVICE, THE FUEL CONTRACTOR AND A <br /> TANK SLAB P I A N Q GILBARCO AUTHORIZED SERVICE CONTRACTOR <br /> MUST BE ON SITE ONE (1) HOUR PRIOR TO <br /> 2 STARTUP AND MUST REMAIN ON SITE THREE (3) <br /> 1�8"=1'-0" ADDITIONAL HOURS FOR A TOTAL OF FOUR (4) <br /> HOURS. ANY COSTS INCURRED OVER FOUR(4) ch <br /> co <br /> _ HOURS DUE TO FUELING SYSTEM ISSUES, o <br /> SHOULD BE BILLED AS A CHANGE ORDERNMI . ti Q <br /> 71Frr 3" OVER 2" DBL-WALL FIBERGLASS J <br /> VENT PIPING -SLOPE FROM X I` <br /> i <br /> I I REMOTE VENT DOWN TO TANKS INTERSTITIAL MONITOR W Y <br /> TANK#3 DIESEL FILL SUMP U F- Z <br /> 1 S� I 1/8" PER FOOT MIN REF 5-G6.1 AND 4-G3.0 REF 4-G6.1 AND 2-G4.1 Z Z W o < <br /> III3-G1.0 TANK#1 FILL/VAPOR SUMP (RUL) ## KEY NOTES -> � <br /> REF 4-G6.1 AND 1-G4.1 TANK#3 STP SUMP (DIESEL) > 1-- Q 0 <br /> VAPOR POLISHER <br /> L&L- REF 4-G6.1 AND 2-G4.0 - U) Z <br /> 1 �� z ZU Q <br /> REF 1-G6.0 \ <br /> INTERSTITIAL MONITOR w Q - Z <br /> G6.0 3" OVER 2" DBL WALL FIBERGLASS CHASE REF 5-G6.1 AND 4-G3.0 1❑ 6"CONCRETE SLAB AT FUELING CANOPY. / 0 0 Z <br /> L---�/ PIPING BETWEEN TANK SUMPS TYPICAL REF GO.1 AND CIVIL DRAWINGS FOR TOS W � W Y <br /> REF 1-G12.1 10ANK FT #1 TANK#3 ELEVATIONS. J Lo UO - <br /> 20,000 GAL Ca �:OD 4 10 FT DIA w Lo � <br /> REGULAR A O ® 12,000 GAL �2 GEOTECH FABRIC MATERIAL TO EXTEND 36" I W w U) (D <br /> UNLEADED DIESEL PAST EACH SIDE OF PIPING TRENCH. ALL I� 00 I Z <br /> GEOTECH FABRIC SHALL BE PINNED PRIOR TO <br /> REF 1-G3.0 111 REF 2-G3.0 BACKFILLING. METHOD OF PINNING FABRIC AT Q ~ LLJ <br /> TANK#1 STP SUMP (RUL) <br /> REF 4-G6.1 AND 1-G4.0 _____________ TANK#2 STP SUMP (PUL) TOP OF EXCAVATION TO BE APPROVED BY THE _ D <br /> ______- REF 4-G6.1 AND 1-G4.0 7-ELEVEN CONSTRUCTION MANAGER. Co IL <br /> - - TANK#2 FILL/VAPOR SUMP (PUL) 3 PIPING TRENCHES SHALL BE DUG IN SUCH A co <br /> REF 4-G6.1 AND 1-G4.1 MANNER THAT THE TRENCH WIDTH IS EQUAL TO <br /> TANK#2 AT LEAST TWICE WIDTH OF ALL PIPING <br /> 10 FT DIA <br /> CONTAINED WITHIN. MAINTAIN A MINIMUM OF 4" <br /> 1 I I 8,000 GAL (10cm) CLEAR DISTANCE BETWEEN PIPING <br /> PREMIUM POSITIONED IN THE TRENCH AND 6"WHERE <br /> w - = J176 J190 J204 UNLEADED REF 2-G3.0 <br /> PIPING CROSSES OVER EACH OTHER. THE <br /> BOTTOM OF THE TRENCH SHALL BE AS <br /> o I I REF 1-G5.0 UNIFORM AS POSSIBLE TO ELIMINATE HIGH <br /> FLOW RATE FLOW RATE _ SPOTS AND ENSURING AN EVEN LAYER OF <br /> (RUL AND PUL) (DSL) 1 1 I I BEDDING MATERIAL UNDER THE PIPE. REMOVE W <br /> o I lO0 1I oO <br /> j�REI <br /> TYP ALL SHARP ROCKS AND DEBRIS FROM THE <br /> 1-6 NOZZLES - 10 GPM 1-4 NOZZLES - 10 GPM 2-G6.0 TRENCH BOTTOM BEFORE BEDDING MATERIAL <br /> IS INSTALLED. <br /> 8 NOZZLES - 9.8 GPM J20 J19 J17 o DISP 1( o i i o D DISP 2 ® SITE CONDITIONS MAY CAUSE VARIATIONS W <br /> 10 NOZZLES - 8.5 GPM REF 1-G5.0 WHICH MUST BE APPROVED BY 7-ELEVEN AND <br /> 3-G1.0 w MANUFACTURER. PIPING BURIAL DEPTHS LESS <br /> 12 NOZZLES - 7.5 GPM i i THAN 18" REQUIRES 7-ELEVEN APPROVAL. <br /> 4" OVER 3" DBL-WALL <br /> FIBERGLASS MAIN TRUNK Z c� <br /> NOTE: I I LINE VAPOR PIPING- O <br /> REF 1-G6.1 FOR DIMENSIONS AND I I SLOPE 1/8" PER FOOT MIN z <br /> LOCATIONS OF DISPENSERS. <br /> 3" OVER 2" DBL-WALL z g <br /> FIBERGLASS PRODUCT w X <br /> 3"X 2" REDUCER PIPING -SLOPE 1/8" PER <br /> wo <br /> BUSHING (6 LOC) FOOT MIN Z a Em <br /> REF 5-G5.0w Lu J <br /> 1 11 1 a o 3 <br /> Q 3 <br /> 11 <br /> W <br /> TEE IS SET AT <br /> � = <br /> 45°ANGLE, TYP <br /> > =M <br /> W N Z v <br /> r Ii w u N <br /> Lu <br /> w = J <br /> F O <br /> W <br /> F <br /> 1 1 1 1 J17 J190 J204 <br /> Q <br /> ° �° II °� ° REF 1-G5.0 Adk <br /> STREET SIDE <br /> STORE SIDE 0 II <br /> J20 J19 J17 o DISP 3 6 0 11 080 DISP 4 0 CV J <br /> REF 1-G5.0 11 N Z ~ <br /> II o Q p z CNo <br /> II <br /> DISPENSER <br /> STATION 11 m <br /> ID TYPICAL 11 36" MIN U <br /> TYPICAL F7 <br /> 0 U <br /> II 4 d co o o U <br /> 3" OVER 2" DBL-WALL 11 a e a d a n n d a a n - <br /> n $ e e � d ° ° a <br /> A a d as A d a <br /> FIBERGLASS 11 a e a A d d a < d a e e d'v ° d da � _o <br /> VAPOR PIPING -SLOPE 1/8" 0� - tz <br /> PER FOOT MIN. TRANSITION I I 0 c L 0 c C <br /> c o} 0 o <br /> o cljTO 4"OVER 3"AT TRUNK LINE I I (OR PPROVED ALTERNATE) o'o o 0) a,)p �o D ca <br /> c� <br /> `V 2 E <br /> WRAPPED CANOPY COLUMN TYPICAL - - 02 .9� c o L In Fu <br /> N REF SHEET G8.0 AND 1~ m 0 0 <br /> CANOPY MFR DRAWINGS 03 ADD 10 INCHES OF WIDTH Q o 0 2 aXi�L c � �'�_E Fu <br /> 01 TO PIPING TRENCH FOR In0 v a> c: <br /> i U i Oto 7'-�� <br /> 0 9 11 REF1-G5.0 ® ® to oq--U 0-co U'-�_ 0-0 to <br /> o Oo oO O 02 EACH ADDITIONAL PIPE - 0 `n 0 to o 0.0 0 <br /> c� cnw� E <br /> 00 a) 0a) =3 a to <br /> p0� pt3Oi00 tn00 <br /> Of c z iz) E-E vL °N�� E <br /> J20 J19 J17 o DISP 5 10 0 o 12 DISP 6 0 ca- 01 p o 0 0 0 C9.Lcu <br /> REF 1-G5.0 10" 10" 102" <br /> c:::? <br /> � 7r ?ro QFtOF ESS/ <br /> l <br /> Q_ (4 PIPE)48"WIDE TRENCH <br /> 0 <br /> (3 PIPE)36"WIDE TRENCH c 35558 x <br /> z <br /> z90° ELBOW IS SET AT N� P� <br /> �, 2 PIPE 26"WIDE TRENCH 9� CHAC' Q� <br /> 45°ANGLE, TYP 16"WIDE TRENCH OF CAL�FO <br /> z (1 PIPE) <br /> Uj <br /> 03/26/20 <br /> SHEET: <br /> U `Lj P P N G TRENCH SECTION <br /> cn = � UE � P P NG PIAN G1 . 0 <br /> LLj =: <br /> cz <br /> FUELING - USA CA <br />