Laserfiche WebLink
OPW7150 Overfill Materials Important <br /> Prevention Valves In order to prevent product <br /> Valve Body: Cast aluminum spillage from the Underground <br /> Storage Tank (UST), properly <br /> The CARE-certified OPW 7150 <br /> Float: Nitrile rubber, closed cell foam maintained delivery equipment <br /> vapor-tight Overfill Prevention Valve Valve: Aluminum and a proper connection at the <br /> is designed to prevent the overfill of tight-fill adaptor are essential. <br /> underground storage tanks by providing Seals: Viton® Delivery personnel should <br /> managed and trained <br /> a positive shut-off of product delivery. Upper & lower Drop Tube: Aluminum to <br /> inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts: Acetal and noses for damaged and <br /> the drop tube used for gravity filling, r c missing parts. They should <br /> Hardware: Stainless steel `qPM always make certain there <br /> The OPW 71 SO allows easy installation s a positive connection <br /> (without breaking concrete) and requires between the adaptor and <br /> Features elbow. If delivery equipment <br /> no special manholes. 4� Simple, Easy and Quick is not properly maintained, <br /> ,I The OPW 71 SO is a vapor-tight two- Installation — no excavation or or the elbow is not securely <br /> stage shut-off valve. When the liquid special manholes required. coupled to the adaptor, a <br /> p q serious spill may result when <br /> level rises to about 95% of tank Economical — costs a fraction the DPW 71 SO closes, causing <br /> capacity, the valve mechanism is a hazard and environmental <br /> released, closing automatically with of expensive, complicated and contamination. <br /> the flow. This reduces the flow rate to difficult-to-install valves. <br /> approximately 5 gpm through a bypass 4- Furnished Complete — supplied NOTE: The DPW 7150 is <br /> with new upper and lower drop tubes, designed for use on tight-fill <br /> valve. The operator may then stop the pp P gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thoroughI Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time. I fill applications. <br /> exceeds the 95% level, the valve will Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform, no resets ® Retrofits Directly — for both new <br /> is attempted. and no overrides to be broken and existing tanks with 4 " fill risers. <br /> If the delivery is not stopped and the or abused. 40� Quick Drain Feature — <br /> liquid rises to about 98% of tank ® No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level . pressure is relieved. <br /> completely. No additional liquid can flow ® Will Accept a Dipstick ® Best Flow Rate in The Industry* <br /> into the tank until the level drops below for Gauging <br /> a reset point, * 0113W Test Lab results <br /> NOTE: The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity, Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and ® Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to Operation — does not rely on the spill risk. <br /> determine the regulatory requirements alertness or speed of response of the ® Speeds Delivery Operations <br /> governing shut-off capacity in your delivery attendant for certainty of — product flows unimpeded into <br /> region, as well as take into account overfillrevention. <br /> other considerations such as extreme p the tank until the hose " kick" that <br /> tank tilt. In all cases, the upper tube Keeps the Top of UST " Dry," accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 6 1 /2 " to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level. <br /> off flow into the tank completely before bung fittings and the need for ® Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation — in both two-point <br /> EPA requirements, ® Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required. <br /> Number: H15524PA <br /> Look for this label for <br /> Listings and U ` authentic OPW EVR <br /> O 1 � Approved products, <br /> Certifications a:alit«:eo�a OPW 7150 is EVR Approved for E85 <br /> is OhW lo <br /> INSm. i: �� : ii <br />