Laserfiche WebLink
Environmental Health Department <br />Corrective Action Statement <br />RE: September 12, 2019, Hazardous Waste inspection report <br />For each violation listed below, indicate if the violation has been corrected or will be corrected by a certain date. Also, <br />describe what was done to correct the violation in the space provided below each violation. Submit this completed form <br />with the Return to Compliance Certification within 30 days of inspection. If you have any questions, please contact <br />Jason Gaitan at (209) 468-9848 or jgaitan@sjgov.org. <br />OLD CASTLE INFRASTRUCTURE, 10304 W LINNE RD, CERS ID: 10183145, PR0539719 <br />Violation #505 - Failed to completely label stationary hazardous waste tanks. <br />¨ This violation was corrected ¨ This violation will be corrected by (date): <br />¨ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Violation #601 - Stored hazardous waste onsite greater than 180 days. <br />¨ This violation was corrected ¨ This violation will be corrected by (date): <br />¨ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Violation #605 - Failed to completely label containers or portable tanks of hazardous waste. <br />¨ This violation was corrected ¨ This violation will be corrected by (date): <br />¨ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Page 3 of 5 <br />Rev. 8/27/2019 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjcehd.com <br />Label added to hazardous waste tank. <br />Pictures included on attached power point. <br />Used Oil absorbent and used oil have <br />been hauled off-site. <br />barrels have also been hauled by safety kleen on 10/9/2019. Used oil barrel underneath <br />Labels added to 4 barrels of oil absorbent. These <br />filter crusher and all used fluorescent light bulbs have been labelled as well. Light bulbs were <br />also hauled off-site on 10/25/19. Pictures included on attached power point along with manifests.