My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 2:08:02 PM
Creation date
8/4/2020 9:16:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231072
PE
2361 - UST FACILITY
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
2705 COUNTRY CLUB BLVD STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br /> SAN-6-JOAQUIN <br /> I.rC O U T Time In: <br /> Time Out: <br /> r <br /> r'�JFOSX:, Careotness grows here. <br /> Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: TESORO(SPEEDWAY)68221 Date: 10/07/2020 <br /> Address: 2705 COUNTRY CLUB BLVD , STOCKTON 95204 <br /> Requestor: SARAH JABLONSKY-CONSTRUCTION MANAGER,WALTON ENGINEER Telephone: (916)373-1165 <br /> Program Element: 2308-UST RETROFIT Request#: SR0082450 <br /> Inspection Type: 298-UST RETROFIT REPAIR INSPECTION <br /> Onsite Service Technician: Ray Hernandez ICC Service Tech/Installer Exp. Date: 05/07/2021 <br /> Manufacturer training: FF, 07/25/21 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site for overfill prevention verification. The following items were observed on site: <br /> 1. Verified drop tube functionality for both the 91 (8k)&diesel (4k). <br /> 2. Witnessed measurements of upper drop tube lengths for 91 (39 3/16)&diesel (41 3/4) <br /> 3. Witnessed measurements of drop tube seat surface to bottom of tank for 91 (126 1/2)&diesel (128 3/4) <br /> Additional information is needed for the following reasons: The dimensions used on the tank charts do not match the <br /> installation plan per EHD records. The installation plan has a total tank length of 384 inches and a diameter of 97 inches. <br /> Provide tank charts with the correct dimensions for each tank. <br /> This facility must be equipped with properly installed and approved overfill prevention equipment prior to receiving fuel. <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code.If a reinspection is required,fees will be assessed at the current hourly rate. <br /> Received by: Name and Title: emailed to Sarah Jablonsky, Constru <br /> EH Specialist: VICKY VANG-LEE Phone: <br /> FA0002048 SR0082450 SC298 10/07/2020 <br /> EHD 23-01 Rev.06/30/15 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.