Laserfiche WebLink
Environmental Health Department <br /> SAN-6-JOAQUIN <br /> I.rC O U T Time In: <br /> Time Out: <br /> r <br /> r'�JFOSX:, Careotness grows here. <br /> Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: TESORO(SPEEDWAY)68221 Date: 10/07/2020 <br /> Address: 2705 COUNTRY CLUB BLVD , STOCKTON 95204 <br /> Requestor: SARAH JABLONSKY-CONSTRUCTION MANAGER,WALTON ENGINEER Telephone: (916)373-1165 <br /> Program Element: 2308-UST RETROFIT Request#: SR0082450 <br /> Inspection Type: 298-UST RETROFIT REPAIR INSPECTION <br /> Onsite Service Technician: Ray Hernandez ICC Service Tech/Installer Exp. Date: 05/07/2021 <br /> Manufacturer training: FF, 07/25/21 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site for overfill prevention verification. The following items were observed on site: <br /> 1. Verified drop tube functionality for both the 91 (8k)&diesel (4k). <br /> 2. Witnessed measurements of upper drop tube lengths for 91 (39 3/16)&diesel (41 3/4) <br /> 3. Witnessed measurements of drop tube seat surface to bottom of tank for 91 (126 1/2)&diesel (128 3/4) <br /> Additional information is needed for the following reasons: The dimensions used on the tank charts do not match the <br /> installation plan per EHD records. The installation plan has a total tank length of 384 inches and a diameter of 97 inches. <br /> Provide tank charts with the correct dimensions for each tank. <br /> This facility must be equipped with properly installed and approved overfill prevention equipment prior to receiving fuel. <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code.If a reinspection is required,fees will be assessed at the current hourly rate. <br /> Received by: Name and Title: emailed to Sarah Jablonsky, Constru <br /> EH Specialist: VICKY VANG-LEE Phone: <br /> FA0002048 SR0082450 SC298 10/07/2020 <br /> EHD 23-01 Rev.06/30/15 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />