Laserfiche WebLink
3.0 CONCLUSIONS, RECOMMENDATIONS AND PROJECT STATUS <br /> • <br /> Between .tune 25, and August 27, 2004, the groundwater surface dropped an average of 0 83 <br /> feet, the groundwater gradient increased from 0 0080 to 0 0084 foottfoot, and the groundwater <br /> flow direction remained toward the north-northeast These groundwater flow and gradient <br /> characteristics are relatively consistent with seasonal and historical trends <br /> , = Between June 25, and August 27, 2004, the concentrations of gasoline compounds in <br /> groundwater generally increased slightly in MW-1, and decreased in MW-3 and MW-4 As shown <br /> on Figure 6, due to the detection of gasoline compounds at MW-3, the lateral extent of impacted <br /> 1 groundwater appears to be undefined to the northwest and west of the site <br /> On October 22, 2004, Ramage Environmental published Work Plan, Additional Site Investigation, <br /> which proposed the installation of three additional groundwater table monitoring wells, north and <br /> west of the site The proposed well locations are shown on Figure 7 <br /> �I <br /> On November 9, 2004, EHD approved the work plan with comments <br /> On December 14 2004 Ramage Environmental requested permission from the adjacent property <br /> owner to install two of the monitoring wells on their property To date, permission to access the <br /> property remains pending Ramage Environmental expects to obtain the access agreement <br /> during the first quarter of 2005 <br /> �i <br /> On December 14, 2004, Ramage Environmental submitted to EHD, Project Status and Request <br /> ForExtenslon Ramage Environmental expects to implement the approved scope of work during <br /> the first quarter of 2005 <br /> i <br /> I <br /> 9 <br />